Form 43343050
Jan 2014
-13-
Typical Assembly Overview
(CTS/CTA 40FT Shown with
Optional U-Bend)
8 to 10
6 hanging points to be used for suspension. There
must be two hanging points on the first tube and one
on each of the other tubes
Maximum 6 distance
from control box &
draft inducer to first
tube support/hanger
bracket.
8 to 9 ¼
Wire Hanger
Draft Inducer
Assembly
#10 Self-Drill Screws
(Typical all tube supports
and tube couplings.)
4"OD x 10Ft.
Aluminized Steel Tube
13 Tube Support Brk.
with U-Bolt Clamp
& 5/16" Hex Nuts
Tube Flange (12 Radial Hole)
Gasket
Control Box
Gasket
Typical
Overlap
U-Bend
(accessory)
Tube Coupling
(Typical each tube joint.)
Reflector
31 Tube Support Brk.
with U-Bolt Clamp
& 5/16" Hex Nuts
Draft Inducer
Flange
3
(control to reflector)
Note: CTS heater - Aluminized steel first tube only.