4.5
Alternative Pad Plan
If sump/drain is not used lift will require 1/2” shims under the lag plates to allow proper water
drainage. The base frame must be shimmed and/or grouted according to the pad plan to
ensure the base frame is properly supported. Hydraulic connections are to be made at the
couplings on the roller end of the base frame.
BASE FRAME
2° SLOPE GRADE
AWAY FROM PAD
PLATE AREA
THROW OVER
COUPLINGS FOR
HYDRAULIC
CONNECTIONS. FOR
MACHINES MOUNTED ON
PADS WITH NO CONDUIT
ROUTING PROVIDED.
6"
LAGS
FILLED WITH
CONCRETE TYP.
(BY CONTRACTOR)
8" STEEL PIPE
PLATFORM LENGTH
PLATFORM
WIDTH
FRAME
LAGS
2X
BASE
6"
NOTES:
IF SUMP IS NOT USED, THE BASE FRAME
•
MUST BE RAISED 1/2" TO ALLOW FOR
PROPER WATER DRAINAGE.
CROSS HATCHING INDICATES AREAS OF
•
BASE FRAME THAT MUST BE SHIMMED
AND/OR GROUTED AFTER LEVELING OF THE
BASE FRAME TO ENSURE PROPER BASE
FRAME SUPPORT.
IF CONDUIT RUN IN PAD IS NOT USED FOR
•
HYDRAULIC ROUTING CONNECTIONS ARE
TO BE MADE AT COUPLINGS ON ROLLER
END OF BASE FRAME.
HINGE
END
OF
BASE
SURFACE MUST BE
SMOOTH AND LEVEL
WELL COMPACTED WITH
NO VOIDS
CONCRETE PAD MUST BE
CENTER LINE OF BUMPER
POSTS TO BE ALIGNED WITH
EDGE OF PAD
36"
48"
8"
ROLLER END
Ø3/4” LAG HOLES FOR Ø5/8”
ANCHORS WITH MIN. 2000 LB
PULL OUT. (BY INSTALLER)