INSTALLATION INSTRUCTIONS
SECTION 3: SELF-GENERATING COUNTER TOP
STEAM JACKETED KETTLES
a) Position kettle on counter allowing sufficient rear clearance from wall for kettle to
tilt freely and completely without obstruction.
b) Mark four corner locations of kettle base. Refer to drawing below
c) Remove kettle from counter and locate position of 4 holes as per above
drawing. Drill four 7/16" diameter holes.
d) Apply a continuous bead of Silastic or other equivalent sealant
along the complete perimeter edge of the kettle base and reposition kettle on
counter.
e) Use 5/16-18 Hex Cap Screws with suitable flat washers to bolt
down.. Screw lengths must be 1-1/4" long plus counter top thickness. (EC-20
Counter Top Models require an additional 1/2" of bolt length).
f) Wipe off excess sealant
g) A Control Box with power supply equivalent to Electrical Rating of kettle
should be located conveniently nearby.
h) A waterproof electrical connection for power supply to console housing
must be provided.
i) Ground kettle to terminal provided inside console housing.
j) Turn power ON and check for proper operation.
Содержание KECT-05F
Страница 1: ...MANUAL FOR SELF GENERATING COUNTER TOP STEAM JACKETED KETTLES SOUTHBEND MODEL KECT 05F KECT 10F ...
Страница 5: ...OPERATING CONTROLS AND INDICATORS SECTION 2 SELF GENERATING COUNTER TOP STEAM JACKETED KETTLES FIG 1 ...
Страница 11: ...PARTS LIST SECTION 7 SELF GENERATING COUNTER TOP STEAM JACKETED KETTLES FIG 2 ...
Страница 13: ...PARTS LIST SECTION 7 SELF GENERATING COUNTER TOP STEAM JACKETED KETTLES FIG 3 ...
Страница 16: ...WIRING DIAGRAMS SECTION 8 MODELS EC 5 EC 6 ...
Страница 17: ...WIRING DIAGRAMS SECTION 8 MODELS EC 5 EC 6 ...
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......