4
Parts list
No
Spe
Qty
No
Spe
Spe
1
Monitor
1
15
Bolt M8*40
2
2
Screw M5*10
4
16
Washer D8×Φ25×2
2
3
Bolt M8x40*15
2
17
Washer d8
3
4
Washer D8×1.5×φ20
6
18L/R
L&R pedals
1
5
Washer D8
4
19L/R
Nylon nut
1
6
Handlebar weld
1
20
Nut M8
4
7
Main frame weld
1
21
Rear bottom weld
1
8
Spring knob M16*1.5*22
1
22
front bottom tube weld
1
9
Seat
1
23
Sensor wire
1
10
M8 nylon nut
5
24
plug
1
11
Seat tube weld
1
25
Spring washerΦ8
1
12
Backrest
1
26L/R
L&R crank
1
13
Screw M8x45*15
4
63
Tension Knob
1
14
Seat weld
1
64
Rope
1
Product Assembly step
1.
NOTICE:
A. Please make sure there has enough space around the machine before assembly
B. Please use the provided tools or right tools by yourself.
C. Check the parts and the hardware first.
2. Assembly step:
Step1
:
Pull out the main frame
(
7
)
plug
(
24
)
as pic 1, disassembly main frame(7) as pic 1
,
lock
the plug
(
24
)
as pic 2
Содержание A90-229
Страница 1: ...ASSEMBLY INSTRUCTION INaoc002_CA A90 229 READ AND SAVE THIS INSTRUCTION FOR FUTURE USE...
Страница 3: ...3...
Страница 13: ...13...
Страница 22: ......