Performance Verification
WFM 1125 Option 0A/0B/0C/0D Service Manual
4-23
H
The display changes to SegmentFframe format mode.
36. Open SW4.
H
The display changes to Interlace format mode.
This test confirms the signal level of the MONITOR output.
The following equipment is required.
Equipment Required
HDTV signal generator (TSG1001 and PSC1125)
Sampling oscilloscope
Two parallel signal cables
75
W
BNC cable
Two 50
W
BNC cables
Two 75ĆtoĆ50
W
minimumĆloss pads
Two SMAĆtoĆBNC adapters
Connections.
Refer to Figure 4–7 for connections.
Using the cables supplied with the PSC1125, connect between the G/Y on the
TSG1001 and Y on the PSC1125, and between the B/Pb on the TSG1001 and
P
B
/P
R
on the PSC1125.
Using the 75
W
BNC cable, connect the OUT1 connector on the PSC1125 rear
panel to the CH A connector on the waveform monitor rear panel.
Attach the SMA-to-BNC adapters to the CH1 connector and TRIGGER
DIRECT INPUT connector on the oscilloscope.
Attach the 75-to-50
W
minimum-loss pads to OUT2 connector on the PSC1125
rear panel and MONITOR connector on the waveform monitor rear panel.
Using one of the 50
W
BNC cable, connect the OUT2 attenuator on the PSC1125
to the TRIGGER DIRECT INPUT adapter on the oscilloscope.
Using the other 50
W
BNC cable, connect the MONITOR attenuator on the
waveform monitor to the CH1 adapter on the oscilloscope.
MONITOR output
Содержание Tektronix WFM 1125
Страница 4: ......
Страница 6: ......
Страница 14: ...Service Safety Summary viii WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 20: ...Introduction xiv WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 21: ...Specifications ...
Страница 22: ......
Страница 39: ...Operating Information ...
Страница 40: ......
Страница 42: ...Preparation for Use 2 2 WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 56: ...Using the Menu 2 16 WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 61: ...Theory of Operation ...
Страница 62: ......
Страница 68: ...Theory of Operation 3 6 WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 69: ...Performance Verification ...
Страница 70: ......
Страница 96: ...Performance Verification 4 26 WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 97: ...Adjustment Procedure ...
Страница 98: ......
Страница 112: ...Adjustment Procedures 5 14 WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 113: ...Maintenance ...
Страница 114: ......
Страница 122: ...Removal and Installation Procedures 6 8 WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 145: ...Options ...
Страница 146: ......
Страница 149: ...Electrical Parts List ...
Страница 150: ......
Страница 152: ...Electrical Parts List 8 2 WFM 1125 Option 0A 0B 0C 0D Service Manual ...
Страница 153: ...Diagrams ...
Страница 154: ......
Страница 159: ...Mechanical Parts List ...
Страница 160: ......
Страница 168: ...10 8 WFM 1125 Option 0A 0B 0C 0D Service Manual Please cut away this area below the lines ...
Страница 171: ......
Страница 172: ......