— 4 —
IMPORTANT SERVICE GUIDE
◆
MODE SWITCH (PROGRAM SWITCH) ASSEMBLY POINT
1) When installing the ass’y deck on the Main PCB, be sure to align the assembly point of mode switch.
ASSEMBLY POINT
(ALIGN TWO ARROWS)
Fig. 1
Fig. 2
Fig. 3
FRAME
◆
HOW TO EJECT THE CASSETTE TAPE
(If the tape is stuck in the unit)
1) Turn the Gear Worm
1
clockwise in the direction of arrow with a screwdriver. (See Fig. 2)
(Other method ; Remove the screw of Motor Load Ass’y, Separate the Motor Load Ass’y)
2) When Slider S, T approached the unloading position, rotate holder Clutch counterclockwise after inserting screwdriver in the frame’s bottom hole
in order to wind the unwound tape. (Refer to Fig. 3)
(If you rotate Gear Worm
1
continuously when tape is in state of unwinding, you may cause tape contamination by grease and tape damage. Be
sure to wind the unwound tape in the state of set horizontally.)
3) Rotate Gear Worm
1
clockwise using screwdriver again up to the state of eject mode and then pick out the tape. (Refer to Fig. 2)
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299