2-5
1
BELT
3
PULLEY GEAR
4
GEAR TRAY
9
3 HOOKS
0
HOUSING PCB
qa
HOOK
7
2 SCREWS
5
SLIDER HOUSING
2
HOOK
"A"
"B"
<Bottom Side>
"C"
"C"
"C"
2-2-3 Housing Ass’y Removal
Fig. 2-9 Housing Ass’y Removal
1) Remove Belt
1
.
2) Push the Hook
2
in the direction arrow “A” and lift up Pulley Gear
3
.
3) Push the Slider Housing
5
in the direction arrow “B” and lift up the Gear Tray
4
.
4) Lift up the Slider Housing
5
.
5) Remove the soldering
6
of 2 points (Red, Black).
6) Remove 2 Screws
7
and lift down the Motor Load Ass’y
8
.
7) Push the 2 Hooks
9
bottom side in the direction arrow “C” and lift up the Housing PCB
q;
.
8) Push the Hooks
qa
and remove Deck PCB
qs
.
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299