1-2 (E)
MAV-70
1-2. Installation Procedure
n
Keep the packing materials such as carton, cushion, etc.
after unpacking.
When transporting the unit, pack the unit using the materi-
als provided.
Pack the HDDs separately.
1-3. Operating Conditions and
Installation Space
1-3-1. Operating Conditions
1. Set the operating temperature and humidity
within the following conditions.
Operating Temperature :
+
5
d
C to
+
40
d
C
Operating humidity :
10 % to 90 %
(Condensation not allowed)
Storage temperature :
_
20
d
C to +60
d
C
2. Do not install this unit in the following
locations.
.
Areas where the unit will be exposed to direct
sunlight or any other strong lights.
.
Dusty areas or areas where the unit will be subject to
vibration.
.
Areas with strong electric or magnetic fields.
.
Areas near heat sources.
.
Areas where the unit will be subjected to electrical
noise.
.
Areas where the unit will be subjected to static
electricity noise.
.
Unstable and unbalanced places.
3. To prevent the internal temperature from
rising, ensure air ventilation of the place
where the unit is installed.
The ventilating slots should be 20 cm away from the
walls for proper ventilation.
c
Do not block the ventilation slots.
If the ventilation slots are blocked, overheating inside the
unit may cause fire.
1-2. Installation Procedure
1-3. Operating Conditions and Installation Space
Start
Determination of
installation place
Option boards
installation
Rack mounting
Power unit
installation
HDD unit installation
Connection
Formatting
Loop connection
End
1-3. Operating Conditions
and Installation Space
1-4. Power Supply
1-5. Installation
Option Boards
1-6. Rack Mounting
1-8. Power Unit
(BKMA-PS70)
Installation
1-9. HDD Unit
Installation
1-10. Signal Input and Output
1-11. Connecting Connectors
and Cable
1-12. Switch Settings of the
Connector Panel
1-13. Format HDD
1-14. Loop Connection