60
4. Remove the harness clamp.
5. Remove the screw.
6. Remove the MB-1259 board from the B to B connector (CN2) on the NET-49 board.
7. Install the removed parts by reversing the steps of removal.
PSW
3 x 8
CN2
Harness clamp
B-to-B connector
(CN104)
MB-1259 board
NET-49 board