2-1
Note:
Follow the disassembly procedure in the numerical order given.
2-2. DISK BASE ASSEMBLY REMOVAL
2-4. BU HOLDER REMOVAL
2-3. BASE UNIT REMOVAL
SECTION 2
DISASSEMBLY
DVP-PQ2
2-1. LID ASSEMBLY REMOVAL
1
Ring
1
One Screw
(M2x8)
2
Shaft (LID)
3
Lid assy
2
Four ornamental
screws (M3 x 12)
1
Four ornamental sheets (screw)
3
Disk base assembly
Note:
When you tighten four screws, in order not to make a crevice
between a disk base and a lower case, please hold from both
sides.
3
Two screws
(+BV3 x 10)
5
Two screws
(+BV3 x 10)
8
BU holder
1
Flexible flat cable
Harness
(IS-059)
(CN811)
9
Flexible flat cable
(CN203)(CN204)
0
SW 406 board
2
Connector
(CN950)
7
Two screws
(+BV3 x 10)
7
Four screws
(+BV3 x 10)
6
Three screws
(M2 x 8)
4
SW panel assembly
1
Three INS screws
2
Base unit
3
Two flexible flat cables
(FMP-006, 005)
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299