Quick System Setup
Install and Cable LED Wall
— Ensure that your FLX
LED wall is properly installed and cabled.
1
Rackmount DX-100
— Ensure that the DX-100 is
properly installed in your equipment rack.
(Chapter 3, “Rack-Mount Installation”)
2
5
6
P/N 26-0901004-00, Rev 00
Quick Start Guide
Visibly yours
Barco, Inc.
11101 Trade Center Drive
Rancho Cordova, CA
95670 • USA
Phone:
Fax:
Technical Support:
Website:
+1 (916) 859-2500
+1 (916) 859-2515
+1 (866) 374-7878
www.barco.com
Power Installation
— Connect power to the DX-100
and all peripheral equipment, such as your video
sources. (Chapter 3, “Power Installation”)
Connect Inputs
— As required, connect inputs to the
DX-100's
DVI
and
SD/HD-SDI
inputs. (Chapter 3,
“Signal Installation”)
7
8
Power On
— Turn on power to the DX-100, sources,
the LED wall and (if required) Fiberlink.
9
10
3
4
The following list summarizes the
overall DX-100 setup procedure. For
error-free installation, always refer to
the listed section in the User’s Guide.
DX-100
Status
Handles
Two recessed handles
enable you to easily
insert or withdraw the
chassis from a rack.
Status LED
The following indications are provided:
On power up, the LED initializes to Orange, and
remains Orange while the DX-100 boots. The
LED also turns orange during any “reset” mode.
The LED turns Green once the DX-100 can be
controlled remotely.
The LED blinks Red (at a 2 second interval) if the
DX-100 detects that the FLX controller is drawing
too much current.
IMPORTANT
There are no operational controls
on the DX-100. The DX-100 is set
up and operated entirely from
Barco’s
Director Toolset
.
Connect Output
— Connect the DX-100's NNI LED
output to the data input of the FLX LED wall.
(Chapter 3, “Signal Installation”)
Connect Genlock
— Connect a composite sync or
black burst signal to the
Genlock In
connector.
(Chapter 3, “Signal Installation”)
Connect Director Toolset
— Connect your laptop
PC to DX-100 via Ethernet. Ensure that
Director
Toolset
is properly installed on the laptop.
(Chapter 3, “Signal Installation”)
Connect Fiberlink
— If required, connect the
Fiberlink NNI transmitter and receiver. (Appendix C,
“Installation”)
System Operation
— Use
Director Toolset
for all
DX-100 setup and operations. Refer to the
Director
Toolset User’s Guide
for instructions.
IMPORTANT
Director Toolset
version 2.03 or