DVP-CX995V
19
3-17. LOCK SW BOARD, LOADING SW BOARD
claws
1
Rotate the pulley (400) in the
direction of the arrow
A
fully.
3
Rotate the pulley (400) in the
direction of the arrow
B
fully.
2
screw
(BVTP3
×
8)
5
screw (BVTP3
×
12)
4
belt (400)
8
screw
(BVTP3
×
8)
0
screw
(BVTP2.6)
qa
LOADING SW
board
9
LOCK SW
board
7
gear (center)
6
pulley (400)
Note for installation
When installing the
LOADING SW board and
LOCK SW boards,
align the leads position as shown.
LOADING SW board
LOCK SW board
leads
position
A
B