13
3-8. BASE UNIT-2 (BU-21BD53A)
3-9. OPTICAL PICK-UP SECTION (CD)
1
floating screw
(PTPWH M2.6)
3
base unit (BU-21BD53A)
4
spring, cone coil
holder (BU) assy
4
spring, cone coil
2
three floating screws
(DIA. 12)
1
flat type wire (14 core)
(CN102)
3
sled shaft
gear (B)
rack, shutter
4
optical pick-up (CD)
2
Release the lever in the
arrow direction
B
.
B
B
Note for installation
Rack, shutter should be fit to the gear(B) groove.
Содержание CDP-LSA1
Страница 22: ...22 Adjustment Location BD BOARD SIDE B TP FE TP TE TP VC TP XPCK TP RFAC IC103 30 16 15 1 ...
Страница 30: ...CDP LSA1 30 30 6 7 SCHEMATIC DIAGRAM MAIN 1 3 SECTION See page 28 for Printed Wiring Board ...
Страница 35: ...CDP LSA1 35 35 6 11 SCHEMATIC DIAGRAM PANEL SECTION See page 33 for Waveforms ...
Страница 37: ...CDP LSA1 37 37 6 13 SCHEMATIC DIAGRAM POWER SECTION ...