1-10 (E)
BKPF-R70
S4-8: Debug mode selection
If selects OPEN, the board stops the operation.
OPEN (Upper) :
Debug mode
CLOSE (Lower) : Normal operation (Factory setting)
7
7
7
7
7
S5: Test switch
n
If the circuit test is executed, the setting data of this board is initialized. Copy the setting data to
BZR-10 for backup. For the details of the copying procedure and circuit test, refer to the optional
maintenance manual of BKPF-R70.
S5 Setting
Description
0
Normal operation (Factory setting)
8
Circuit test (Simple test for operation)
1 to 7, 9, A to F
Factory use only
8
8
8
8
8
S8: Board switch
Used to set this board as the main board or as the backup board.
A side : Sets this board as the main board and the indicator (D18) lights.
After two seconds from turning on the power, this board starts operating.
B side : Sets this board as the backup board.
After three seconds from turning on the power, this board starts operating.
9
9
9
9
9
COR2: S-BUS Remote connection selection
Set COR2 to SBON if installs this board to a device which has the S-BUS remote connectors, such as
PFV-D300.
If installs two BKPF-R70 to PFV-D300 for the main board and backup board, set COR2 on the both
boards to SBON. If the PFV-D300 is connected to the S-BUS line, the REMOTE 1 (S-BUS) connec-
tor A of this board is connected to the S-BUS line without a cable and bridge.
fig1-16E
1-7. Location and Function of Switches/ LEDs
When selects SBON
SBON
When selects SBOFF
(Factory setting)
SBON