24
3. Run cables into the storage system
Using the holes in the top left corner of the main
cabinet as shown in
"Place conduits" on page
20
, insert cables of the appropriate wire gauge
and ampacity for the utility grid connection, the
microgrid connection, and the optional generator
connection.
Sonnen has created the appropriate
number and size conduit penetrations
for a typical installation. Every attempt
should be made to follow this conduit
legend to facilitate proper wire installation to the
unit. Making new or enlarging existing conduit
penetrations will void the system's warranty.
4. Prepare cable and strip wires
Fig. 25 Stripping cable
Strip 1 inch of insulation from the L1, L2, and N
cables.
5. Confirm transfer switch has full range of
movement
Using the black plastic actuator, ensure the
automatic transfer switch has a full range of
movement.
Fig. 26 Automatic transfer switch actuator
6. Connect microgrid cables to storage system
terminals
Fig. 27 Microgrid connections - ATS version
Tools needed:
‒
6mm hex wrench
1 inch
L2
Содержание sonnenBatterie ecoLinx 10
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 17: ...9 Dimensions Fig 1 Storage system dimensions Key components Fig 2 ecoLinx key components...
Страница 30: ...22 page 23 page 23 page 29 page 23 Fig 22 Terminal map for ecoLinx...
Страница 53: ...45 Appendix 1 Nameplates...
Страница 54: ...46...
Страница 55: ...47...
Страница 61: ...53...
Страница 62: ......
Страница 63: ......
Страница 64: ...sonnen Inc 2048 Weems Road Suite C Tucker GA 30084 T 1 310 853 2404 E info sonnen batterie com PN 28336 Rev 003...