Specifications

ecoLinx 

model

10

12

14

16

18

20

Usable 

capacity 

(100% DOD)

10 kWh

12 kWh

14 kWh

16 kWh

18 kWh

20 kWh

Continuous 

power output 

(at 25 deg C)

7kW

8 kW

8 kW

8 kW

8kW

8kW

Dimensions 

W"/H"/D"

(approx.)

26x 84x 16

26x 84x 16

26x 84x 16

26x 84x 16

26x 84 x 16

26x 84 x 16

Weight 

(approx.)

622 lbs.

683 lbs.

741 lbs.

800 lbs.

850 lbs.

900 lbs.

Nominal 

current

33.3A

Cell 

chemistry

Lithium iron phosphate (LiFePo

4

)

Nominal 

voltage

120/240VAC

Device 

protection

Short circuit, overload, over temperature

Ambient  

temperature

41°F - 113°F (5°C - 45°C)

Maximum  

Humidity

90%, non-condensing

Applications

Self-Consumption, Backup, Time of Use, Home Automation Integration

Grid 

integration

AC coupled

On-grid specifications

Nominal 

power

7kW

8kW

8kW

8kW

8kW

8kW

Table 1  Specifications

Содержание sonnenBatterie ecoLinx 10

Страница 1: ...Installation and Operating Manual sonnenBatterie ecoLinx 1 310 853 2404 info sonnen batterie com www sonnen batterie com...

Страница 2: ......

Страница 3: ...f the material contained herein may be reproduced without written consent of the author Copyright 2018 Disclaimer The information in this document is subject to change without notice The manufacturer...

Страница 4: ......

Страница 5: ...he storage system 16 Mounting the storage system 16 Electrical connections 21 Connecting AC cables 23 Connecting a generator optional 26 Connecting an Ethernet cable 26 Generator Autostart wiring opti...

Страница 6: ...TS Version 26 Fig 31 Ethernet socket location ATS version 26 Fig 32 12V signal connection 27 Fig 33 24V signal connection 27 Fig 34 Dry Contact signal connection 28 Fig 35 Dry Contact connection 28 Fi...

Страница 7: ...Tables Table 1 Specifications 5 Table 2 Conduit entries and cable sizes 20 Table 3 Battery module voltages 30 Table 4 Commissioning prerequisites 36 Table 5 Required open ports for storage system 43...

Страница 8: ......

Страница 9: ...nnenBatterie ecoLinx can be installed in any number of buildings or sites powered by AC electricity For a full glossary of terms used in this manual see page 48 Symbols used Warnings WARNING WORD Warn...

Страница 10: ...o not expose the storage system to direct sunlight Do not use the storage system in areas where the ammonia content of the air exceeds 20 ppm Do not use the storage system when corrosive gases are pre...

Страница 11: ...spite diligent construction cells inside the battery modules can still degrade or catch fire in the event of mechanical damage heat or a fault Possible effects include Heating of battery modules Escap...

Страница 12: ...torage system A fire in the storage system can be extinguished by conventional agents The use of water is advisable to cool the battery modules and thus prevent the thermal runaway of modules that are...

Страница 13: ...ht approx 622 lbs 683 lbs 741 lbs 800 lbs 850 lbs 900 lbs Nominal current 33 3A Cell chemistry Lithium iron phosphate LiFePo4 Nominal voltage 120 240VAC Device protection Short circuit overload over t...

Страница 14: ...Overcurrent protection needed 50A General specifications Transfer switch Automatic integrated Transfer time 100 ms Backup capacity 2 kilowatt hours per battery module up to 20 kilowatt hours Certific...

Страница 15: ...Pass through 200 amps 240VAC Power plant 33 33 amps 240VAC AC output voltage 120 240 volts AC grid voltage 120 240 volts Nominal frequency 60 Hz Adjustable frequency range 0 7 Hz from nominal Meterin...

Страница 16: ...48 56 VDC Capacity 10 20kWh 2 kWh per module Charge current 30A per module nominal 70A per module max Cell discharge 100 DoD Overcharge Protection Fuse protection Sizing requirements in relation to P...

Страница 17: ...9 Dimensions Fig 1 Storage system dimensions Key components Fig 2 ecoLinx key components...

Страница 18: ...ge system manages solar power 1 and power from the utility grid 2 to maximize your energy independence and savings on your power bill Fig 3 Energy flow Modes of operation The sonnenBatterie ecoLinx of...

Страница 19: ...ll continue to operate The PV array will first power the loads on the AC panel with any excess energy charging the batteries in the storage unit If there is insufficient PV to cover the loads the stor...

Страница 20: ...the storage system into account for proper rating The storage system incorporates an internal power meter to measure loads This meter uses current transformers on the microgrid side of the storage sy...

Страница 21: ...ent temperature between 41 F 113 F 5 C 45 C Humidity max 90 non condensing Properly ventilated Fire safety regulations observed Free of corrosive and explosive gases Plain surface that can bear heavy...

Страница 22: ...damage Inspect the interior of the storage system before installing Install the storage system only if no condensation is visible If the storage system was transported at temperatures below 32 F 0 C...

Страница 23: ...g a mounting location Select a location with the following attributes Ambient temperature between 41 F 113 F 5 C 45 C Humidity max 90 non condensing Maximum elevation of 9 842 feet 3 000 meters above...

Страница 24: ...m CAUTION Risk of injury cabinet may fall over Until the battery modules are installed the cabinets are extremely top heavy Hold onto the storage system during installation 1 Install the mounting clea...

Страница 25: ...net Place the battery cabinet on the leveling mat 4 Mount the cabinet on the cleat Fig 10 Positioning the mounting bracket Position the cabinet so that the mounting bracket on the cabinet is above the...

Страница 26: ...ry cabinet and secured with four bolts Fig 15 Connecting cabinets left side Fig 16 Connecting cabinets right side Tools needed 5mm hex wrench Connect the main cabinet to the battery cabinet using the...

Страница 27: ...wo edge protectors on the two long sides of the opening between the main and battery cabinets making sure to cover the edges of both cabinets Using a utility knife trim the edge protectors to fit if n...

Страница 28: ...onduit penetrations for a typical installation Every attempt should be made to follow this conduit legend to facilitate proper wire installation to the unit Making new or enlarging existing conduit pe...

Страница 29: ...llation Observe all relevant regulations and standards WARNING Danger to life by electric shock when working on the storage system or power distribution Make sure no voltage is present Ensure the main...

Страница 30: ...22 page 23 page 23 page 29 page 23 Fig 22 Terminal map for ecoLinx...

Страница 31: ...otected loads panel you can use the storage system s built in 200 amp automatic transfer switch to provide backup power for your whole house In that configuration the system is installed as shown here...

Страница 32: ...made to follow this conduit legend to facilitate proper wire installation to the unit Making new or enlarging existing conduit penetrations will void the system s warranty 4 Prepare cable and strip w...

Страница 33: ...terminals are in the bank on the left side and the N terminal is in the bank in the back Connect the grid L1 and L2 cables to the storage system s terminals with the corresponding labels Using your mu...

Страница 34: ...rge the battery modules in the event of an extended loss of grid power Fig 30 Generator AC connections ATS Version Tools needed 1 8 inch tip screwdriver The connections are on the main connection rail...

Страница 35: ...g 32 12V signal connection 24V Signal 1 Locate the green 2 position plug connector provided in the accessory kit 2 Insert stripped ends of customer s 24V connection cables into the 2 position plug 3 E...

Страница 36: ...jumper wire 0205 connected to J5 port of the hub board 2 Disconnect and remove both ends of wire 0205 from the 2 position plug connector 3 Install a normally closed plunger style 24V rated switch in...

Страница 37: ...out of the top of the unit Fig 36 Current transformer markings Run L1 through current transformer 1 The side of the current transformer with P1 and K must face the PV inverter The side with L and P2...

Страница 38: ...Tools needed Voltmeter Measure and note all voltages between the internal plus pole and the negative terminal of all battery modules Use the following table to record the voltages Module Voltage Modul...

Страница 39: ...All other battery modules must have switch No 4 set to OFF 5 Place battery modules Fig 42 Placing battery modules Stack the battery modules so the battery modules designated No 0 and No 7 are closer...

Страница 40: ...he negative poles of the battery modules to each other 7 Install horizontal battery connections Fig 44 Installing horizontal battery connections Place the wider flat red bus bars on the positive termi...

Страница 41: ...CDEF I F 1 I F 2 B B O N 1 2 3 4 0123456789ABCDEF I F 1 I F 2 B B O N 1 2 3 4 0123456789ABCDEF I F 1 I F 2 B B O N 1 2 3 4 0123456789ABCDEF I F 1 I F 2 B B O N 1 2 3 4 0123456789ABCDEF I F 1 I F 2 B B...

Страница 42: ...ttery module No 0 daisy chain the battery modules using the communication cables in sequence i e module 0 to module 1 module 1 to module 2 etc The communication wire must click into place If you must...

Страница 43: ...el isolation Attention Damages caused by improper wiring are not covered by your warranty Manually move the automatic transfer switch to the offgrid down position Ensure the storage system s breaker i...

Страница 44: ...lectrical connections fulfills all requirements of local regional and national regulations The main distribution panel and protected loads panel are electrically isolated The electrical connections of...

Страница 45: ...o the storage unit Use the following login information to access the storage unit Account Installer Password Sonnen Installer2016 Press start to begin the Commissioning Assistant The Commissioning Ass...

Страница 46: ...Maximum SOC Set this to the state of charge at which the generator should stop providing power Set to 0 if you won t be using a generator Press Continue 8 Enter Time of Use settings Fig 58 Time of Us...

Страница 47: ...nter the following information Reenable Microgrid Select Yes to enable this feature or not to leave it disabled User Input Time One Set this to the earliest time you want to attempt charging User Inpu...

Страница 48: ...g information about installer Input information about the installer Check the confirmation box at the end Press Continue 13 Select Operating Mode Fig 63 Selecting Operating Mode Select the desired ope...

Страница 49: ...shift occurs and grid tie inverter shuts down You should see the following error message on the storage system High SOC Disable microgrid power production 6 Allow the state of charge to drop to 89 7 V...

Страница 50: ...ton 2 Confirm shut down Press Yes to confirm shut down The shut down takes approximately 60 seconds Emergency switch off In case of an emergency the storage system can be switched off by the main circ...

Страница 51: ...llowing outbound TCP and UDP ports are permitted for the following services in the router The listed ports are generally preconfigured on the routers TCP Port Service 22 SecureShell ssh 37 Time Server...

Страница 52: ...inet Checking the storage unit Monthly Check the area around storage unit for safety hazards or potential maintenance issues including debris and chemical vapors that can degrade electrical insulation...

Страница 53: ...45 Appendix 1 Nameplates...

Страница 54: ...46...

Страница 55: ...47...

Страница 56: ...es as opposed to self generated power Kilowatt hour A measurement of energy equal to one kilowatt delivered for one hour Load shedding The method of removing power to appliances either to keep the loa...

Страница 57: ...minals 3 ftlbs 4Nm 3 0 AC Input and Output Terminals 81 7 inlbs 9 25Nm Inverter DC cables 60 inlbs 6 9Nm Inverter ground wire 25 inlbs 2 8Nm Cabinet connections 31 inlbs 3 5Nm Access panel 25 inlbs 2...

Страница 58: ...d subject to the conditions listed below Product Warranty The Product Warranty is not intended to be a durability warranty as end user conditions and usage is variable 2 Performance Warranty sonnen In...

Страница 59: ...site during the installation process by the Authorized Dealer or a person to whom the title to the Covered Product has been transferred provided that the Covered Product remains in its original locati...

Страница 60: ...e defective device for compensation for costs arising from disassembly and installation or loss of profits are expressly NOT covered by this Factory Warranty e In no event will sonnen Inc be held resp...

Страница 61: ...53...

Страница 62: ......

Страница 63: ......

Страница 64: ...sonnen Inc 2048 Weems Road Suite C Tucker GA 30084 T 1 310 853 2404 E info sonnen batterie com PN 28336 Rev 003...

Отзывы: