Vertical contact toaster
10
P/N 1010926 Rev. B 04/12
Sonic
A.J. Antunes & Co.
maintenance (continued)
replacing the black and silver release
sheet (every 4–6 weeks)
nOte: Depending on toaster usage and on how
well it is cleaned daily, the black and silver release
sheet may last between 30–45 days.
1. Remove and discard the Release Sheet.
2. Lay a new Release Sheet on a clean, dry surface
and fold it in half lengthwise. gently crease it at
the fold using only your fingers.
3. install the Release Sheet just as you would after
daily cleaning (figure 4).
fold over so
ends meet.
Press Lightly with
finger to form crease.
figure 6. removing conveyor belt chain
Rotation
upper Support Rod
Large Link
P/N 0800121
Small Link
P/N 0800204
figure 5. measuring conveyor belt chains
checking the conveyor belt chains
(every 3–6 months)
nOte: the bun thickness compression Knobs
(figure 3) must be set to “6 & 6” prior to measur-
ing or removing or reinstalling the conveyor belt
chains.
measUrinG anD aDJUstinG cOnVeyOr belt cHains
1. turn the unit off, unplug the power cord, and
allow the unit to cool.
2. Remove the Bun feeder, Butter Wheel, Pan, and
Heat Shield (figure 1) and set the Bun thickness
compression Knobs to 6 & 6.
3. facing the toaster, locate the approximate center-
point of the conveyor chain.
4. Pull the conveyor chain away from the edge of
the toaster (figure 5).
5. Stand a u.S. Dime on end between the frame
and the chain (figure 5).
6. if the gap is significantly wider than the coin,
ReMoVe links as described below.
7. Disconnect the Conveyor Belt Chain by squeez-
ing any two links together and unhooking both
ends of one link (figure 6). Needle-nose pliers
may be used.
8. Remove one 1/2” link from the belt.
9. Reassemble the conveyor Belt chain onto
the sprockets as described below in Replacing
conveyor Belt chains.
10. Measure the gap again to ensure it is not too
tight.
11. check the opposite side of the toaster using the
same steps.
nOte: if the conveyor belt chain is too tight to be
reassembled, remove an additional 1/2” small link
and install a 3/4” large link in its place. this will
shorten the conveyor belt chain by 1/4” overall.
12. Reassemble the unit and return to service.
figure 4. folding the release sheet