PAT-806-IT
– USER MANUAL
48
4.12 Leakage current measurement on welding circuit I
L
Press
I
L
. The screen informing about the read-
iness for measurement will be displayed.
When parameters must be changed press
SET (upper limit value and the measurement
time are set).
Connect the power plug of the tested welding machine to the
mains socket, other than PAT. Connect the outputs of the weld-
ing machine to U1 and U2 sockets of the meter.
Содержание PAT-806-IT
Страница 1: ......
Страница 2: ......
Страница 74: ...PAT 806 IT USER MANUAL 72 NOTES...
Страница 75: ......
Страница 76: ......