Sommer GmbH
24
7.5. Measurement and discharge calculation
Every discharge measurement with the TQ-F system requires preparatory operations like placing
the probes in the water and preparing the tracer solution. These operations are explained in this
section of the manual.
Click on
Next (F2)
In the following form descriptions of the measurement to be performed can be inputted. The input of
the amount of tracer substance (
5.3) is mandatory. The other input fields are used for
documentation purposes only.
With
Next (F2)
the measured values are already displayed:
If the measurement is performed by one single operator only, recording the measured data
should be started at this point. Afterwards the prepared tracer solution is injected.