ELECTRICAL INSTALLATION
1)
PRE-WIRED CONTROL PANELS, OPERATOR DEVICES & ELECTRIC VALVES BY
SOMAT.
2)
INSTALL CONDUITS FROM PANEL TO PREWIRED JUNCTION BOX, PULL
MOTOR WIRES AND CONTROL WIRES THRU SEPERATE CONDUIT AND DO THE
FINAL TERMINATIONS.
2) GROUND ALL ELECTRICAL EQUIPMENT.
3) CONTROL CIRCUIT TO BE 115 VAC AND/OR 24VDC NOMINAL.(SEE APPROVED
DRAWINGS)
4) ALL SOM-A-TROL PANELS ARE TO BE WIRED IN ACCORDANCE TO LOCAL,
STATE AND/OR NATIONAL ELECTRIC CODE (NEC 1993) SPECIFICATIONS.
5) INTEGRAL PUSH BUTTONS ARE LOCATED IN PANEL DOOR AND PRE-WIRED AT
FACTORY. OPTIONAL REMOTE PUSH BUTTON STATION IF SUPPLIED; TO BE
MOUNTED & WIRED AT WORK STATION BY ELECTRICIAN. (BRACKET
REQUIRED BY CUSTOMER).
PANEL & OPTIONAL REMOTE PBS MOUNTING:
1) Mount the Som-A-Trol
®
in a suitable location (see Installation Drawings) so that the
bottom of the panel is at least 42" above the finished floor or in accordance with
ADA requirements.
2) Install the Optional Remote Push Button Station onto the Dish Table or at another
convenient location. (See Diagram and Installation Drawings.)
MOUNTING PATTERN FOR THREE HOLE PUSH BUTTON STATIONS
Содержание SPC-75S
Страница 12: ...Installation ...
Страница 16: ...MOUNTING DETAIL OF TROUGH ...
Страница 21: ...FOR REFERENCE ONLY ...
Страница 22: ...Start Up ...
Страница 26: ...Operation ...
Страница 32: ...CLEANING YOUR SYSTEM ...
Страница 38: ...MAINTENANCE ...
Страница 49: ...TROUBLESHOOTING ...
Страница 56: ...REPLACEMENT PARTS EXPLODED VIEWS ...
Страница 57: ......
Страница 60: ......
Страница 62: ......