Installation of the pellet-run boiler
5.1. Before installation
Before starting the installation, carry out the following actions:
Check immediately on receipt that the delivered product is complete and in good
condition. Any defects should be reported before installing the appliance.
Remove the user manual and hand it to the customer.
Place the boiler in its final operating position and adjust the 6 feet by turning
them so that they all bear the same load and the machine is level.
Figure 5 - Unpacking the boiler
Connect a duct of suitable diameter between the flue gas outlet and a flue for
exhausting fumes to the outside of the building (e.g., chimney) - see diagrams in
sections 6.1 and 6.2.
Carrying out the hydraulic installation, see 6.3.
Connect the 230VAC supply cable to an earthed mains socket.
The machine is fitted with a chrono-thermostat on the control panel. As an
option a conventional external programmer (not supplied) can be used to
automatically set the operating times of the appliance, see section 5.3.
Содержание SZM A PLUS 16 kW
Страница 13: ...9 4 2 Connections views Figure 4 Pellet boilers connections SZM A PLUS 16 24 and 32 kW ...
Страница 23: ...19 Figure 16 Side view of the installation without chimney ...
Страница 25: ...21 Figure 18 Example of flue duct installation B ...
Страница 62: ...58 ...
Страница 63: ...59 ...
Страница 64: ...60 ...