35
Worm drive rotation time ("On").
Ventilation power level.
Hydraulic circuit pressure
11.
Start-up
To start up the pellet-run boiler, press the start/stop button for 3 seconds.
The display should indicate "Acendimento" (Lighting) until this completion
of this phase.
The pellets will be pushed through the supply channel into the burning
basket (combustion chamber), where they will be ignited using a heater
coil. This process may take between 10 and 15 minutes, depending on
whether the pellet transport worm screw has been previously loaded with
fuel or is empty. Upon completion of the ignition phase, the word "On"
should appear on the display.
ON
OFF
OF
F
+
OK
OFF
MENU
OFF
MODE
OFF
ESC
OFF
-
MAN
AUT
OFF
esc
0.00s
<
Tempo Cóclea
>
ON
OFF
OF
F
+
OK
OFF
MENU
OFF
MODE
OFF
ESC
OFF
-
MAN
AUT
OFF
esc
35
<
Atuação
Fan1
>
ON
OFF
OF
F
+
OK
OFF
MENU
OFF
MODE
OFF
ESC
OFF
-
MAN
AUT
OFF
esc
1.5bar
< Pressão
Água >
><<z<<gbgh
Содержание SZM A 18 KW
Страница 15: ...12 b c Figure 6 Examples of standard installations ...
Страница 50: ...47 a b Figure 27 b and c a b ...
Страница 76: ...73 WARNING THE UNIT WILL BE HOT DURING OPERATION SO YOU NEED TO BE ESPECIALLY CAREFUL OF THE DOOR HANDLE ...
Страница 81: ...78 23 Electrical diagram of the pellet run boiler Figure 67 Electrical diagram of the circuit board ...
Страница 82: ...79 Figure 68 Electrical diagram of the external silo s circuit board ...
Страница 87: ...84 ...
Страница 88: ...85 ...
Страница 89: ...86 ...