45
a)
b)
d)
e)
Figure 24 – Connecting the sensors to the circuit board
2 – Next, you should remove the storage unit’s level sensor. By default,
it comes installed on the left side of the storage unit (the storage unit is
set up by default to be installed on the right side of the boiler). To do this,
loosen the screws of the part that supports the sensor and remove the
set.
Figure 25 – Removing the storage unit’s level sensor
3 – With the sensors already connected to the circuit board, you must
connect the boiler to the mains.
Содержание SZM A 18 KW
Страница 15: ...12 b c Figure 6 Examples of standard installations ...
Страница 50: ...47 a b Figure 27 b and c a b ...
Страница 76: ...73 WARNING THE UNIT WILL BE HOT DURING OPERATION SO YOU NEED TO BE ESPECIALLY CAREFUL OF THE DOOR HANDLE ...
Страница 81: ...78 23 Electrical diagram of the pellet run boiler Figure 67 Electrical diagram of the circuit board ...
Страница 82: ...79 Figure 68 Electrical diagram of the external silo s circuit board ...
Страница 87: ...84 ...
Страница 88: ...85 ...
Страница 89: ...86 ...