
3
Equipment Structure:
Included:
1 Ozone Generator SSO
-
O3
-
SPA01
1 Silicone Tube
1 Check Valve
1 Venturi ½
”
User Manual
Wall
-
mouted screws
Installation and Operation Instructions
1.1
-
Remove the equipment and the silicone tube from the box.
1.2
-
Turn off power to SPA. Be sure the electrical power is shut OFF at the main circuit
breaker before installing the SSO
-
O3
-
SPA01.
1.3
-
Find the ozone generator installation fitting, on the wall of the equipment
compartment. Install the SSO
-
O3
-
SPA01 at the ozone generator installation fitting, use the
mounting screws and fasten the unit to the wall.
Note: Be cautions of the mounting location as to not cause the screws to penetrate any
plumbing. The SSO
-
O3
-
SPA01 must be mounted indoors or sheltered, under a cover, from
natural elements (rain, sun, ...). Mount the SSO
-
O3
-
SPA01 so that is inaccessible to anyone
in the SPA.
1.4
-
The SSO
-
O3
-
SPA01 must be installed horizontally, with the front image on the right
position and the Ozone Outlet turned to the left/down side (see image 2). Use both
mounting flanges and install the equipment as high as possible with the protected
equipment area.
1.5
-
Plumbing
-
for an optimal dissolution of ozone into the SPA Water, install the SSO
-
O3
-
SPA01 mixing system in the Water circulation lina as shown in Image 2:
1.5.1
-
Connect the additional silicone tube (supplied with the Ozone Generator) to the
check valve on the SSO
-
O3
-
SPA01.
..
EN
SSO
-
O3
-
SPA01
-
User Manual (EN)
Copyright @ 2020 Ozone Solution. All rights reserved. This document accompanies the O
3
System for SPAs. This document is subject to review.
Merely illustrative images.
Ver2/01
-
Ver.02
Image 1
-
Equipment Structure
Power Cable
Ozone Generator
Check Valve
Fuse
Ozone Outlet