2.3   Requirements for Common Locations

This part describes the requirements for the installation locations.

2.3.1 Environment

The switch can be installed on the desk or the cabinet. The location of the chassis, cabinet plann
ing and indoor cabling are very important for normal

system’s function. Short distance between d

evices, bad ventilation and untouchable control plate will cause maintenance problems, systemat
ic faulty and breakdown.

For location planning and device locating, 

refer to section 2.3.2 “Location Configuration  Preventio

n”.

2.3.2 Location Configuration Prevention

The following preventive measures assist you to design the proper environment for the  switch.

Make sure that the workshop is well-ventilated, the heat of TX devices is  well-discharged and 

sufficient air circulation is provided for device cooling.

Avoid to damage devices by following the electrostatic discharge prevention  procedure.

Put the chassis at the place where cool air can blow off the heat inside the  chassis. Make sur

e the chassis is sealed because the opened chassis will reverse  the cool air flow.

2.3.3 Cabinet Configuration

The following content assists you to make a proper cabinet configuration:

Each device on the cabinet gives off heat when it runs. Therefore, the sealed  cabinet must ha

ve the heat-discharge outlet and the cooling fan. Do not put the  devices too close, avoiding ba
d ventilation.

When you install the chassis at the open cabinet, prevent the frame of the  cabinet from blocki

ng the airway of the chassis.

Ensure that nice ventilation is provided for the devices installed at the bottom of  the cabinet.

The clapboard separates exhaust gas and inflow air, and boost the cool air to  flow in the 

chassis. The best location of the clapboard is decided by the air flow  mode in the chassis, 
which can be obtained through different location tests.

2.3.4 Power Requirements

Make sure that the power supply has nice grounding and the power at the input side of the
switch is reliable. The voltage control can be installed if necessary. At least a 240 V and 10A
fuse or a breaker is provided in the phase line if you prepare the short-circuit

prevention

measures for a building.

Caution:

If the power supply system does not have good grounding, or the input power disturbs too much
and excessive pulses exist, the error code rate of communication devices increases and even
the hardware system will be damaged.

SFC4254T Hardware Installation Manual

Содержание SFC4254T

Страница 1: ...SFC4254T Hardware Installation Manual...

Страница 2: ...1 1 Front template of the SFC4254Tswitch Table 1 2 Parts at the front template of the SFC4254T switch Port Features Gigabit Ethernet port UTP RJ45 port with the LINK ACT indicators Gigabit Ethernet po...

Страница 3: ...IEEE 802 3x Flow control IEEE 802 3z asymmetric flow control IEEE 802 3ad Link aggregation Network management standard RFC 1157 SNMP v1 v2 RFC 1213 MIB II RFC 1757 RMON 1 2 3 9 Hardware features Memor...

Страница 4: ...nal laws and regulation s or send these products to our company for collective processing 2 2 Safety Advice 2 2 1 Safety Principles Keep dustless and clean during or after the installation Put the cov...

Страница 5: ...wer line before installing or uninstalli ng the chassis or working beside the power Do not work alone if potential dangers exist Cut off the power before checkout If trouble happens take the following...

Страница 6: ...following content assists you to make a proper cabinet configuration Each device on the cabinet gives off heat when it runs Therefore the sealed cabinet must ha ve the heat discharge outlet and the co...

Страница 7: ...ovided by the SFC4254T switch You yourself need to prepare them The following are the tools and devices needed for the typical installation of the SFC4254T switch Screwdriver Static armguard Bolt Ethe...

Страница 8: ...be directly put on the smooth and safe desk Note Do not put things weighing 4 5 kg or over 4 5 kg on the top of the switch 3 1 2 Installing the Chassis on the Cabinet The chassis of the switch is fix...

Страница 9: ...T switch Table 3 1 Definition of the pins of the console port Note Because the console port of SFC4254T bears no flow control you need to set Data flow control to none when using a superior terminal t...

Страница 10: ...100 1000Base T ports The indicators are labeled with number s 1 48 indicating the link ACT state of the port You can connect other Ethernet terminal devices to the UTP port through the cut through or...

Страница 11: ...the function of auto identification so the five classes of direct through cross network cables can be used to connect other Ethernet devices 3 3 Checkup AfterInstallation Before electrically starting...

Страница 12: ...ou may use the following tools These tools are Crossed screwdriver Static armguard Perform the following steps to open the cover of the switch 1 Turn off the power on off of the switch 2 Plug out all...

Страница 13: ...oint them together along their sides 2 See the following figure 3 When the cover and the bottom are closely tied let the cover slide the slot of the front template at the bottom 4 Nail the bolt and sc...

Страница 14: ...us degrees If the switch cannot be started and the PWR LED is off check the power 5 1 2 Faults Relative with Port Cable and Connection Do the following checkups to help remove the fault If the port of...

Отзывы: