background image

SFC4254T Hardware Installation Manual

Chapter 2

Installation Preparation

2.1 Cautions

Similar to other electronic products, the semiconductor chip easily gets damaged if you power o
n and off abruptly and frequently. To restart up the switch of SFC4254T, you have to open the po
wer on-off three or five seconds after the power is cut off.

Avoid severe collision or falling down from the height to protect the parts in the switch.

Use correct outside ports to connect the switch of SFC4254T. Do not insert the Ethernet plug int
o the console port (RJ45 8-line socket). Similarly, do not insert the console cable into the consol
e port (RJ45 8-line socket).

Note:

1)When you plug or dial out the power line, keep the power line horizontal with the  power socket.

2)When the lifetime of our products ends, handle them according to national laws  and regulation

s, or send these products to our company for collective processing.

2.2   Safety Advice

2.2.1

Safety Principles

• Keep dustless and clean during or after the installation.
• Put the cover at the safe place.
• Put tools at the right place where they are not easily falling down.
• Put on relatively tight clothes, fasten the tie or scarf well and roll up the sleeve,  avoiding stu

mbling the chassis.

• Put on the protective glasses if the environment may cause damage to your  eyes.
• Avoid incorrect operations that may cause damage to human or devices.

2.2.2

Safety Notices

The safety notices mentioned here means that improper operation may lead to body  damage.

• Read the installation guide carefully before you operate the system.
• Only professionals are allowed to install or replace the switch.
• Pull out the AC power socket and close the direct-current power before  operating on the 

chassis or working beside the power source.

• The final configuration of products must comply with relative national laws and  regulations.

Содержание SFC4254T

Страница 1: ...SFC4254T Hardware Installation Manual...

Страница 2: ...1 1 Front template of the SFC4254Tswitch Table 1 2 Parts at the front template of the SFC4254T switch Port Features Gigabit Ethernet port UTP RJ45 port with the LINK ACT indicators Gigabit Ethernet po...

Страница 3: ...IEEE 802 3x Flow control IEEE 802 3z asymmetric flow control IEEE 802 3ad Link aggregation Network management standard RFC 1157 SNMP v1 v2 RFC 1213 MIB II RFC 1757 RMON 1 2 3 9 Hardware features Memor...

Страница 4: ...nal laws and regulation s or send these products to our company for collective processing 2 2 Safety Advice 2 2 1 Safety Principles Keep dustless and clean during or after the installation Put the cov...

Страница 5: ...wer line before installing or uninstalli ng the chassis or working beside the power Do not work alone if potential dangers exist Cut off the power before checkout If trouble happens take the following...

Страница 6: ...following content assists you to make a proper cabinet configuration Each device on the cabinet gives off heat when it runs Therefore the sealed cabinet must ha ve the heat discharge outlet and the co...

Страница 7: ...ovided by the SFC4254T switch You yourself need to prepare them The following are the tools and devices needed for the typical installation of the SFC4254T switch Screwdriver Static armguard Bolt Ethe...

Страница 8: ...be directly put on the smooth and safe desk Note Do not put things weighing 4 5 kg or over 4 5 kg on the top of the switch 3 1 2 Installing the Chassis on the Cabinet The chassis of the switch is fix...

Страница 9: ...T switch Table 3 1 Definition of the pins of the console port Note Because the console port of SFC4254T bears no flow control you need to set Data flow control to none when using a superior terminal t...

Страница 10: ...100 1000Base T ports The indicators are labeled with number s 1 48 indicating the link ACT state of the port You can connect other Ethernet terminal devices to the UTP port through the cut through or...

Страница 11: ...the function of auto identification so the five classes of direct through cross network cables can be used to connect other Ethernet devices 3 3 Checkup AfterInstallation Before electrically starting...

Страница 12: ...ou may use the following tools These tools are Crossed screwdriver Static armguard Perform the following steps to open the cover of the switch 1 Turn off the power on off of the switch 2 Plug out all...

Страница 13: ...oint them together along their sides 2 See the following figure 3 When the cover and the bottom are closely tied let the cover slide the slot of the front template at the bottom 4 Nail the bolt and sc...

Страница 14: ...us degrees If the switch cannot be started and the PWR LED is off check the power 5 1 2 Faults Relative with Port Cable and Connection Do the following checkups to help remove the fault If the port of...

Отзывы: