background image

Chapter 5

Hardware Fault Analysis

The part describes how to remove the fault from the switch.

5.1  Fault Separation

The key for resolving the systematic faults is to separate the fault from the system. You can com
pare what the system is doing with what the system should do to detect the fault. You need to ch
eck the following subsystems:

• Power and cooling systems—power and fan
• Port, cable and connection—ports on the front template of the switch and the  cables connecti

ng these ports

5.1.1  Faults Relative with Power and Cooling System

Do the following checkups to help remove the fault:

• When the power on-off is at the “ON” location, check whether the fan works  normally. If the fa

n does not work well, check the fan.

• If the switch is too hot, check whether the air outlet and air inlet are clean and  then do relative 

operations in section 2.3 “Requirements for Common Locations”.  The working temperature of 
the switch is from 0 to 40 Celsius degrees.

• If the switch cannot be started and the PWR LED is off, check the power.

5.1.2  Faults Relative with Port, Cable and Connection

Do the following checkups to help remove the fault:

• If the port of the switch cannot be linked, check whether the cable is correctly  connected and 

whether the peer connection is normal.

• If the power on-off is at the “ON” location, check the power source and the  power cable.
• If the console port does not work after the system is started up, check whether  the console po

rt is set to a baud rate of 9600 bps, eight data bits, no sum check bit  and one stop bit.

5.2

LED Description

The LED indicator shows that the switch is running. The following table shows the indicators of t
he SFC4254T switch and their description:

No.

Abbrev.

Name

Remarks

1

PWR

Power LED

If the switch is powered on, the indicator  is on.

2

SYS

System LED

If the indicator is always on, the system  is being

started.

If the LED flickers, the system works  normally.

3

LINKACT

Indicator at the top 

of each  port

If the LED is always on, the link on the  port is normal.

If the LED is off, the port is not  connected.

SFC4254T Hardware Installation Manual

Содержание SFC4254T

Страница 1: ...SFC4254T Hardware Installation Manual...

Страница 2: ...1 1 Front template of the SFC4254Tswitch Table 1 2 Parts at the front template of the SFC4254T switch Port Features Gigabit Ethernet port UTP RJ45 port with the LINK ACT indicators Gigabit Ethernet po...

Страница 3: ...IEEE 802 3x Flow control IEEE 802 3z asymmetric flow control IEEE 802 3ad Link aggregation Network management standard RFC 1157 SNMP v1 v2 RFC 1213 MIB II RFC 1757 RMON 1 2 3 9 Hardware features Memor...

Страница 4: ...nal laws and regulation s or send these products to our company for collective processing 2 2 Safety Advice 2 2 1 Safety Principles Keep dustless and clean during or after the installation Put the cov...

Страница 5: ...wer line before installing or uninstalli ng the chassis or working beside the power Do not work alone if potential dangers exist Cut off the power before checkout If trouble happens take the following...

Страница 6: ...following content assists you to make a proper cabinet configuration Each device on the cabinet gives off heat when it runs Therefore the sealed cabinet must ha ve the heat discharge outlet and the co...

Страница 7: ...ovided by the SFC4254T switch You yourself need to prepare them The following are the tools and devices needed for the typical installation of the SFC4254T switch Screwdriver Static armguard Bolt Ethe...

Страница 8: ...be directly put on the smooth and safe desk Note Do not put things weighing 4 5 kg or over 4 5 kg on the top of the switch 3 1 2 Installing the Chassis on the Cabinet The chassis of the switch is fix...

Страница 9: ...T switch Table 3 1 Definition of the pins of the console port Note Because the console port of SFC4254T bears no flow control you need to set Data flow control to none when using a superior terminal t...

Страница 10: ...100 1000Base T ports The indicators are labeled with number s 1 48 indicating the link ACT state of the port You can connect other Ethernet terminal devices to the UTP port through the cut through or...

Страница 11: ...the function of auto identification so the five classes of direct through cross network cables can be used to connect other Ethernet devices 3 3 Checkup AfterInstallation Before electrically starting...

Страница 12: ...ou may use the following tools These tools are Crossed screwdriver Static armguard Perform the following steps to open the cover of the switch 1 Turn off the power on off of the switch 2 Plug out all...

Страница 13: ...oint them together along their sides 2 See the following figure 3 When the cover and the bottom are closely tied let the cover slide the slot of the front template at the bottom 4 Nail the bolt and sc...

Страница 14: ...us degrees If the switch cannot be started and the PWR LED is off check the power 5 1 2 Faults Relative with Port Cable and Connection Do the following checkups to help remove the fault If the port of...

Отзывы: