background image

2.2.3 Safety Principles for Live Working

When you work under electricity, following the following principles:

• Put off ornaments, such as ring, necklace, watch and bracelet, before you  operate under live 

working. When metal articles connect the power to the ground,  short circuit happens and com
ponents may be damaged.

• Please cut off the direct-current connection when you operate the hull or work  near the power 

source.

• When the power is on, do not touch the power.
• Correctly connect the device and the power socket.
• Only professionals are allowed to operate and maintain the device.
• Read the installation guide carefully before the system is powered on.

Note:

• Check potential dangers, such as the humid floor, ungrounded extensible power  line and tatty 

power line.

• Install the emergent on-off at the working room for turning off the power when  trouble happen

s.

• Turn off the power on-off of the switch and plug off the power line before  installing or uninstalli

ng the chassis or working beside the power.

• Do not work alone if potential dangers exist.
• Cut off the power before checkout.
• If trouble happens, take the following measures:

A.

Cut off the system’s power.

B. Alarm.
C. Take proper measures to help persons who are hit by the disaster. Artificial  respiration is n

eeded if necessary.

D. Seek for medical help, or judge the loss and seek for available help.

2.2.4 Electrostatic Discharge Prevention

Electrostatic discharge may damage devices and circuits. Improper treatment may  cause the 
switch to malfunction completely or discontinuously.

Move or locate the devices according to the measures of electrostatic discharge prevention,
ensuring the chassis connects the ground. Another measure is to wear the static-proof hand ring.
If there is no hand ring, use the metal clip with the metal cable to clip the unpainted metal part of
the chassis. In this case, the static is discharged to the ground through the metal cable of the clip.
You can also discharge the static to the ground through your body.

SFC4254T Hardware Installation Manual

Содержание SFC4254T

Страница 1: ...SFC4254T Hardware Installation Manual...

Страница 2: ...1 1 Front template of the SFC4254Tswitch Table 1 2 Parts at the front template of the SFC4254T switch Port Features Gigabit Ethernet port UTP RJ45 port with the LINK ACT indicators Gigabit Ethernet po...

Страница 3: ...IEEE 802 3x Flow control IEEE 802 3z asymmetric flow control IEEE 802 3ad Link aggregation Network management standard RFC 1157 SNMP v1 v2 RFC 1213 MIB II RFC 1757 RMON 1 2 3 9 Hardware features Memor...

Страница 4: ...nal laws and regulation s or send these products to our company for collective processing 2 2 Safety Advice 2 2 1 Safety Principles Keep dustless and clean during or after the installation Put the cov...

Страница 5: ...wer line before installing or uninstalli ng the chassis or working beside the power Do not work alone if potential dangers exist Cut off the power before checkout If trouble happens take the following...

Страница 6: ...following content assists you to make a proper cabinet configuration Each device on the cabinet gives off heat when it runs Therefore the sealed cabinet must ha ve the heat discharge outlet and the co...

Страница 7: ...ovided by the SFC4254T switch You yourself need to prepare them The following are the tools and devices needed for the typical installation of the SFC4254T switch Screwdriver Static armguard Bolt Ethe...

Страница 8: ...be directly put on the smooth and safe desk Note Do not put things weighing 4 5 kg or over 4 5 kg on the top of the switch 3 1 2 Installing the Chassis on the Cabinet The chassis of the switch is fix...

Страница 9: ...T switch Table 3 1 Definition of the pins of the console port Note Because the console port of SFC4254T bears no flow control you need to set Data flow control to none when using a superior terminal t...

Страница 10: ...100 1000Base T ports The indicators are labeled with number s 1 48 indicating the link ACT state of the port You can connect other Ethernet terminal devices to the UTP port through the cut through or...

Страница 11: ...the function of auto identification so the five classes of direct through cross network cables can be used to connect other Ethernet devices 3 3 Checkup AfterInstallation Before electrically starting...

Страница 12: ...ou may use the following tools These tools are Crossed screwdriver Static armguard Perform the following steps to open the cover of the switch 1 Turn off the power on off of the switch 2 Plug out all...

Страница 13: ...oint them together along their sides 2 See the following figure 3 When the cover and the bottom are closely tied let the cover slide the slot of the front template at the bottom 4 Nail the bolt and sc...

Страница 14: ...us degrees If the switch cannot be started and the PWR LED is off check the power 5 1 2 Faults Relative with Port Cable and Connection Do the following checkups to help remove the fault If the port of...

Отзывы: