The higher grid impedance of the AC cable makes it easier to 

disconnect from the grid due to excessive voltage at the feed-in 

point. 

 

The maximum cable lengths depend on the conductor cross-

section as follows: 

Conductor 

cross-

section 

Maximum cable length 

ASW3000

H-S2 

ASW3680

H-S2 

ASW4000 

H-S2 

ASW5000 

H-S2 

ASW6000 

H-S2 

2.5 mm² 

46m 

37 m 

28 m 

17 m 

6m 

4 mm² 

74 m 

59 m 

44 m 

28 m 

12m 

6 mm² 

110 m 

89 m 

67 m 

42 m 

20m 

The required conductor cross-section depends on the inverter 

rating, ambient temperature, routing method, cable type, cable 

losses, applicable installation requirements of the country of 

installation, etc. 

 

Residual current protection 

The product is equipped with an integrated universal current-

sensitive residual current monitoring unit inside. The inverter will 

disconnect immediately from the mains power as soon as fault 

current with a value exceeding the limit. 

 

 

 

 

If an external residual-current device is required, install a type 
B residual-current device which trips at a residual current of 
100 mA or higher. 

Содержание ASW H-S2 Series

Страница 1: ......

Страница 2: ...se 8 2 2 Important safety information 9 2 3 Symbols on the label 11 3 Unpacking 13 3 1 Scope of delivery 13 3 2 Checking for transport damage 14 4 Mounting 15 4 1 Requirements for mounting 15 4 2 Moun...

Страница 3: ...Requirements for the DC Connection 38 6 7 2 Assembling the DC connectors 39 6 7 3 Connecting the PV array 41 6 8 Battery connection 42 6 9 Communication equipment connection 44 6 9 1 Communication 45...

Страница 4: ...chnical Data 63 11 1 DC input data 63 11 2 Battery input data 64 11 3 Grid AC output data 65 11 4 Grid AC intput data 66 11 5 EPS output data 67 11 6 General data 68 11 7Safety regulations 69 11 8 Eff...

Страница 5: ...creased ambient temperature ASW6000H S2 77 11 10 Tools and torque 78 12 Troubleshooting 80 13 Maintenance 83 13 1 Cleaning the contacts of the DC switch 83 13 2 Cleaning the heat sink 83 14 Recycling...

Страница 6: ...ill be supported in priority by the system then battery power exceed consumption power will be drained from grid inverter It can provide power for emergency use during the grid lost by using the energ...

Страница 7: ...n personnel should also be familiar with local requirements rules and regulations Qualified persons must have the following skills Knowledge of how an inverter works and is operated Training in how to...

Страница 8: ...will result in death or serious injury WARNING indicates a hazardous situation which if not be avoided can result in death or serious injury CAUTION indicates a hazardous situation which if not be avo...

Страница 9: ...t the values comply with the permitted operating range of all components at all times 6 Battery negative BAT on inveter side is not grounded as default design Connecting BAT to EARTH are strictly forb...

Страница 10: ...is present in the DC conductors and the live components of the inverter Touching the DC conductors or the live components can lead to lethal electric shocks If you disconnect the DC connectors from th...

Страница 11: ...er resulting in burns or a fire hazard when they are short circuited or wrongly installed Do not wear watches rings or similar metallic items during battery replacement Use insulated tools Put on rubb...

Страница 12: ...carried out by skilled and authorized electricians Beware of hot surfaces The inverter can get hot during operation Avoid contact during operation WEEE designation Do not dispose of the product togeth...

Страница 13: ...s discharge Before opening the covers the inverter must be disconnected from the grid and PV array Wait at least 5 minutes to allow the energy storage capacitors to fully discharge Observe the documen...

Страница 14: ...B Wall mounting bracket 1 piece C Screw accessory 1 set D Documentation 1 set E DC connector 2 pairs F WiFi stick 1 piece G Battery terminal cover 1 set H AC connector 2 pieces I Smart meter 1 piece...

Страница 15: ...king for transport damage Thoroughly inspect the packaging upon delivery If you detect any damage to the packaging which indicates the inverter may have been damaged inform the responsible shipping co...

Страница 16: ...erature of the inverter should be 45 C 4 To avoid direct sunlight rain snow ponding on the inverter it is suggested to mount the inverter in places with a top protective roof Do not completely cover t...

Страница 17: ...tilted backwards Max 15 It is not recommended to install the inverter on the wall made of plasterboards or similar materials The inverter may make noise when working 6 To ensure adequate heat dissipa...

Страница 18: ...dropped The weight of Solplanet inverter is max 21 5 kg There is risk of injury if the inverter is lifted incorrectly or dropped while being transported or when attaching it to or removing it from th...

Страница 19: ...to the wall mounting bracket on both sides using M5 screws Screwdriver type PH2 torque 2 5Nm 4 To protect the inverter from theft attach the padlock provided by customer through the wall mounting bra...

Страница 20: ...hybrid inverter applicable to on grid PV systems and also backup mode With the integrated Energy Management System EMS they can control and optimize the energy flow in order to increase the self consu...

Страница 21: ...blic power grid F Back up load Uninterrupted power equipment G Normal load General electrical equipment H APP Inverter setting and display 5 2 System wiring diagram Australia PV1 INVETER PV1 PV2 PV1 P...

Страница 22: ...nverter Self Consumption Backup Force time use Custom Off grid If mode switching is in operation please stop the inverter first 5 3 1 Self Consumption The photovoltaic energy is preferentially used by...

Страница 23: ...When the load power is too large first from the photovoltaic energy and then battery discharge and finally consume the power from the grid 1 In the morning the photovoltaic energy is insufficient and...

Страница 24: ...y as a backup power supply always keep sufficient energy power supply to the load when GRID failure Load priority battery load GRID When the photovoltaic energy is enough first charge the battery then...

Страница 25: ...event of GRID failure as a backup power supply to the load 1 Photovoltaic priority to charge the battery 2 Under normal conditions the battery does not discharge Even at night 3 When there is a GRID f...

Страница 26: ...Users can manage the energy according to their own needs and set the daily regular charging and discharging on the app Other time follow the Self Consumption mode 5 3 4 Off GRID The inverter operates...

Страница 27: ...on insulated cable ends Do not touch the DC conductors Do not touch any live components of the inverter Have the inverter mounted installed and commissioned only by qualified persons with the appropri...

Страница 28: ...the PV array plus a safety reserve of 20 Install a DC switch to each PV string to isolate the DC side of the inverter We recommend the following electrical connection DC BOX optional AC BOX DC INPUT A...

Страница 29: ...S communication port E METER Merter communication port F DRED DRMs device port G COM1 Wi Fi Stick port H EPS connector I Additional grounding screw J AC connector 6 4 AC connection Danger to life due...

Страница 30: ...0H S2 6000H S2 Object Description Value A External diameter 10 to 16 mm B Conductor cross section 4 to 6 mm C Stripping length of the insulated conductors approx 13 mm D Stripping length of the outer...

Страница 31: ...110 m 89 m 67 m 42 m 20m The required conductor cross section depends on the inverter rating ambient temperature routing method cable type cable losses applicable installation requirements of the cou...

Страница 32: ...No consumer load should be applied between AC circuit breaker and the inverter The selection of the AC circuit breaker rating depends on the wiring design wire cross section area cable type wiring me...

Страница 33: ...when the grounding conductor monitoring is deactivated In order to guarantee safety in accordance with IEC 62109 when the grounding conductor monitoring is deactivated carry out one of the following...

Страница 34: ...hread the swivel nut and threaded sleeve over the AC cable Danger to life due to high voltages in the inverter Touching the live components can lead to lethal electric shocks Before performing the ele...

Страница 35: ...terminals and tighten the screw with a accompanied Torx screwdriver TX 8 torque 1 4Nm Ensure that all conductors are securely in place in the screw terminals on the bush insert Assemble the locking ca...

Страница 36: ...ll local and national rules Make sure that all DC switches and AC circuit breakers have been disconnected before establishing electrical connection Otherwise the high voltage within the inverter may l...

Страница 37: ...adapter to the socket element stuff the sealing sleeve into the adapter and tighten the swivel nut 3 Plug the AC connector into the socket for the EPS connection Object Description Value A External d...

Страница 38: ...ing conductor into the suitable terminal lug and crimp the contact 2 Align the terminal lug with the grounding conductor 3 Insert the screw through the hole located at the housing and tighten it firml...

Страница 39: ...identical tilt The thresholds for the input voltage and the input current of the inverter must be adhered to see Section 10 1 Technical DC input data On the coldest day based on statistical records th...

Страница 40: ...modules must be equipped with the negative DC connectors 6 7 2 Assembling the DC connectors Assemble the DC connectors as described below Be sure to observe the correct polarity The DC connectors are...

Страница 41: ...s 2 Crimp the contacts with the corresponding cables Crimping tool H4TC0001 AMPHENOL 3 Insert the contact cable assembly into back of the corresponding DC plug connector A click should be heard or fel...

Страница 42: ...th a DC cable having the wrong polarity the DC connector must be reassembled again The DC cable must always have the same polarity as the DC connector 5 Ensure that the open circuit voltage of the PV...

Страница 43: ...Battery connection Procedure Damage to the inverter due to moisture and dust penetration Seal the unused DC inputs with sealing plugs so that moisture and dust cannot penetrate the Inverter Make sure...

Страница 44: ...rough the battery terminal cover Screwdriver type T30 or SW10 torque 4 0Nm Object Description Value A External diameter 10 12mm B Copper conductor cross section 20 25mm2 C Stripping length of the cabl...

Страница 45: ...quipment connection Danger to life due to electric shock when live components are touched Disconnect the inverter from all voltage sources before connect the network cable Damage to the inverter due t...

Страница 46: ...he port distribution is as follows 6 9 2 BMS CAN cable connection Procedure 1 RS485 cable pin assignment as below strip the wire as shown in the figure and crimp the copper wire to the appropriate OT...

Страница 47: ...rt the network cable into the corresponding communication terminal of the machine according to the arrow sequence tighten the thread sleeve and then tighten the forcing nut at the tail 6 9 3 DRED cabl...

Страница 48: ...nce and insert the network cable into the RS485 communication client attached 3 Insert the network cable into the corresponding communication terminal of the machine according to the arrow sequence ti...

Страница 49: ...ate OT terminal according to DIN 46228 4 provided by the customer 2 Unscrew the communication port cover cap in the following arrow sequence and insert the network cable into the RS485 communication c...

Страница 50: ...them Screwdriver type PH0 torque 0 7Nm 6 9 5 WiFi connection 1 Take out the WiFi 4G modular included in the scope of delivery 2 Attach the WiFi modular to the connection port in place and tighten it i...

Страница 51: ...nternet with a WLAN connection is shown as follows We offer a remote monitoring app called Solplanet You can install the Solplanet application on a smart phone using Android or an iOS operating system...

Страница 52: ...t pin assignments for demand response modes as follows Pin1 DRM 1 5 Pin2 DRM 2 6 Pin3 DRM 3 7 Pin4 DRM 4 8 Pin5 RefGen Pin6 Com DRM0 Pin7 N A Pin8 N A 7 3 Earth Fault Alarm This inverter complies with...

Страница 53: ...ot exceed the permitted limits Refer to the Section 2 1 Intended use about designing the PV system for the maximum allowed DC voltage Check the polarity of the DC voltage make sure the DC voltage has...

Страница 54: ...ltage check that the battery voltage at the point of connection of the inverter complies with the permitted value Check the polarity of the battery voltage make sure the battery voltage has the correc...

Страница 55: ...he inverter is waterproof Make sure the inverter has been correctly mounted with wall bracket Make sure the cover has been correctly mounted Make sure the communication cable and AC connector have bee...

Страница 56: ...de when leaving the factory For the Australian market the inverter cannot be connected to the grid before the safety related area is set Please select from Australia Region A B C and New Zealand to co...

Страница 57: ...or smart meter settings please refer to the smart meter manual 8 4 2 Initialization set up Download the Solplanet application and then you need to set the battery model working mode electricity meter...

Страница 58: ...ge and cannot feed power into the grid Checking When the inverter meets the start up conditions of each mode the inverter will check feeding conditions at once If there is anything wrong during checki...

Страница 59: ...Overview of the panel The inverter is equipped with five LEDs indicators Object Funct ion Diagram LED Description A SOL AR ON PV active BLINK Self check Soft upgrade OFF PV not active B BAT ON Battery...

Страница 60: ...d is active and connected WHITE BLINK Grid is active Forced off grid RED ON Grid fault OFF Inverter shutdown 9 1 1 LEDs The inverter is equipped with five LED indicators white white yellow red white r...

Страница 61: ...ning The red LED is lit When the inverter is faluty The ERR LED always off when the inverter is operating normally EPS LED The white LED is lit when the EPS is operating normally on load The white LED...

Страница 62: ...lectric shock when touching exposed DC conductors or DC plug contacts if the DC connectors are damaged or loose The DC connectors can break or become damaged become free of the DC cables or no longer...

Страница 63: ...the figure below with a dismounting wrench and pressing down firmly Make sure the DC switch is in the OFF position before operation 6 Release and disconnect the AC connector Rotate the socket element...

Страница 64: ...2 Max PV array power STC 5500Wp 6180Wp 6500Wp 7500Wp 9000Wp Max input voltage 550V MPP voltage range 40V 530V Rated input voltage 380V Initial feeding in voltage 50V Min feed in power 20W Max input cu...

Страница 65: ...Battery input data Type ASW300 0H S2 ASW368 0H S2 ASW400 0H S2 ASW500 0H S2 ASW600 0H S2 Nominal battery voltage 48V Battery voltage range 40V 60V Max charging power 5000W Max discharging power 5000W...

Страница 66: ...rent power 3000VA 3680VA 4000VA 5000VA 6000VA Rated voltage range 220V 230V 160V 300V Rated frequency range 50 60 5Hz Max output current 13 6A 16A 18 2A 21 7A 27 3 Max output fault current 36A 36A 36A...

Страница 67: ...0 0H S2 ASW500 0H S2 ASW600 0H S2 Rated active power 6000W Rated apparent power 6000VA Max apparent power 6000VA Rated voltage range 220V 230V 180V 280V Rated frequency range 50 60 5Hz Max output curr...

Страница 68: ...pe ASW300 0H S2 ASW368 0H S2 ASW400 0H S2 ASW500 0H S2 ASW600 0H S2 Max output apparent power 5000VA Peak output apparent power 7500VA 10s Nominal output voltage 230V Nominal output frequency 50Hz 60H...

Страница 69: ...tion indoor outdoor Mounting information wall mounting bracket DC connection technology SUNCLIX AC connection technology Plug in Connector Operating temperature range 25 60 Relative humidity non conde...

Страница 70: ...ault Alarm cloud based visible AU Protection class according to IEC 62103 overvoltage category according to IEC 60664 1 I II DC III AC Internal overvoltage protection Integrated DC feed in monitoring...

Страница 71: ...to the standardized power output Pac Pac r according to EN 50524 VDE 0126 13 2008 10 cl 4 5 3 Notes Values are based on rated grid voltage cos phi 1 and an ambient temperature of 25 Efficiency curve...

Страница 72: ...European weighted efficiency 96 8 95 6 MPPT efficiency 99 9 Efficiency curve ASW4000H S2 80 00 85 00 90 00 95 00 100 00 0 500 1000 1500 2000 2500 3000 3500 ASW3680H S2 Efficiency 230V 400V 450V 84 00...

Страница 73: ...ean weighted efficiency 96 8 96 1 MPPT efficiency 99 9 Efficiency curve ASW5000H S2 Efficiency Max efficiency European weighted efficiency 96 8 96 3 MPPT efficiency 99 9 86 00 88 00 90 00 92 00 94 00...

Страница 74: ...96 8 96 4 MPPT efficiency 99 9 Discharge Efficiency curve ASW3000H S2 ASW3680H S2 ASW4000H S2 ASW5000H S2 6000H S2 88 00 90 00 92 00 94 00 96 00 98 00 0 1000 2000 3000 4000 5000 6000 7000 ASW6000H S E...

Страница 75: ...r output Power reduction depends on many operating parameters including ambient temperature and input voltage grid voltage grid frequency and power available from the PV modules This device can decrea...

Страница 76: ...User Manual UM0025_ASW3000 6000H S2_EN_V02_0722 75 11 9 1 Power reduction with increased ambient temperature ASW3000H S2 11 9 2 Power reduction with increased ambient temperature ASW3680H S2...

Страница 77: ...76 User Manual UM0025_ASW3000 6000H S2_EN_V02_0722 11 9 3 Power reduction with increased ambient temperature ASW4000H S2 11 9 4 Power reduction with increased ambient temperature ASW5000H S2...

Страница 78: ...000 6000H S2_EN_V02_0722 77 11 9 5 Power reduction with increased ambient temperature ASW6000H S2 The power reduction curve is tested at normal air pressure Different air pressure condition will cause...

Страница 79: ...ection 1 6Nm Screws for connecting the inverter and wall bracket Flat head screwdriver blade with 3 5mm Sunclix DC connector Flat head screwdriver blade 0 4 2 5 Smart meter connector Stick Hand tight...

Страница 80: ...power cables Multimeter Check electrical connection Marker Mark the positions of drill holes ESD glove Wear ESD glove when opening the inverter Safety goggle Wear safety goggle during drilling holes A...

Страница 81: ...rings and make sure it is below the maximum DC input voltage of the inverter If the input voltage is within the permitted range and the fault still occurs it might be that the internal circuit has bro...

Страница 82: ...connection on the inverter If this fault is still being shown contact the service 36 Make sure the grounding connection of the inverter is reliable Make a visual inspection of all PV cables and modul...

Страница 83: ...PV array and reconnect after 3 minutes If this fault is still being shown contact the service 61 62 Check the DRED device communication or operation 65 Check if the ground line is connected with the i...

Страница 84: ...ntacts of the DC switch annually Perform cleaning by cycling the switch to on and off positions 5 times The DC switch is located at the lower left of the enclosure 13 2 Cleaning the heat sink Clean th...

Страница 85: ...2014 EMC Low Voltage Directive 2014 35 EU L 96 357 374 March 29 2014 LVD Radio Equipment Directive 2014 53 EU L 153 62 106 May 22 2014 RED AISWEI Technology Shanghai Co Ltd confirms herewith that the...

Страница 86: ...s and conditions can be downloaded at www solplanet net if required When the customer needs warranty service during the warranty period the customer must provide a copy of the invoice factory warranty...

Страница 87: ...pe Inverter serial number Type and number of connected PV modules Error code Mounting location Installation date Warranty card EMEA Service email service EMEA solplanet net APAC Service email service...

Страница 88: ...User Manual UM0025_ASW3000 6000H S2_EN_V02_0722 87...

Отзывы: