9
ASSEMBLY MANUAL
SPEEDFIT PRO-HOME / PRO-STUDIO
********************************CAUTION*******************************
The hex key provided in this package has been partially covered with
green tape. This will help prevent the hex key from scratching the alumi-
num extrusions during assembly.
************************************************************************
9
NOTCH
NOTCH
Slide Items 3 & 4 into place over the metal plates in Item 9 (Main Base). The smooth sides of
Items 3 &4 should face outward; exterior channel sides should face inward. See the cross-
section view below for details.
Note: Please do not install screws until mentioned later in this assembly manual.
•
3
4
Check Point:
Notch in Items 3 & 4 to be located at
the top. Exterior channels should face
inward.
Exterior channels
facing inward
3
9
4
STEP 2
METAL PLATE
INTERIOR CHANNEL
3
EXTERIOR CHANNEL
STEP 1
OPTIONAL
• Install concrete screws (or wood screws) in the
four designated holes found in Item 9 (Main
Base). Refer to the detailed view on the right.
Follow this step if you wish to permanently anchor your SPEEDFIT PRO-HOME/
PRO-STUDIO system to your flooring.
HARDWARE RECOMMENDED (hardware not included);
• Blue-coated steel screw, flat head, 1/4” Dia, 5” length.
(Example,
TAPCON
brand, or equivalent)
• 6” driver bit extention
Содержание speedfit frame
Страница 1: ...SPEEDFIT PRO HOME SPEEDFIT PRO STUDIO SPEEDFIT FRAME ...
Страница 2: ......
Страница 19: ...19 N O T E S ...
Страница 20: ......