4-1
4
Making Measurements
Introduction
Follow these steps to perform measurements in the field. Also see the Quick Reference
Card, located in the gear pouch of the I-V Measurement Unit.
Before you go to the field to make measurements
Charge the equipment
Before going to the field to make measurements, charge both the I-V Measurement Unit
and SolSensor overnight. The equipment typically runs for 8 hours on a charge. Turn the
equipment off when not in use.
Check that you are using the latest PVA software
Double click the PVA icon on your PC and the software will start. Click on About in the
Help menu to make sure that you have selected the right version of software for the
version of PVA hardware that you will be using. The PVA-1500xx uses version 4.x
software, and the PVA-1000 and PVA-600+ use version 3.x software. To check the latest
available version number, visit
http://www.solmetric.com/downloads-pva.html
Create a Project in the PVA software.
See the earlier chapters in this User Guide for instructions.
It is best to do this at the office where you have an internet connection and engineering
drawings of the PV installation.
Make sure that the Array Tree you create accurately represents the architecture of the PV
system. It is not practical to later make any major changes in the Tree of a large system; it
is easier to start from scratch, but this will erase data you have already taken.
Содержание PVA-1000S
Страница 12: ...xii This page is intentionally left blank ...
Страница 68: ...1 Getting Started 2 56 Over Voltage Warnings ...
Страница 116: ......
Страница 128: ......
Страница 133: ...7 Interpreting Measured I V Curves 7 5 5 4 Rounder knee 6 ...
Страница 148: ......
Страница 152: ...8 Translation of I V Data to Standard Test Conditions 8 4 This page is intentionally left blank ...