Installation and Operation Manual (Rev B)
26
2. Connect the SolrenView Monitoring Harness to the bottom of the SolrenView Gateway by
plugging the six pin Molex connection into the bottom of the Gateway. The connector is keyed,
so it cannot be installed incorrectly. Connectors are as follows:
3. Connect the green connector end of the SolrenView Monitoring Harness to the 5 pin socket on
the Subcombiner PCB board at location P1004.
4. Mount the SolrenView Gateway into the mounting location, orientating the gateway as shown
below (Torque to 8 in-lbs).
Figure 7.3 SolrenView Gateway Installed into Subcombiner
Содержание PVI 14TL
Страница 58: ...Installation and Operation Manual Rev B 58 ...