Solax X3 series Скачать руководство пользователя страница 6

PE Connection and Leakage Current

•  

All inverters incorporate a certified internal Residual Current Device(RCD) in

   order to protect against possible  electrocution and fire hazard in case of a 
   malfunction in the PV array, cables or inverter.There are 2 trip thresholds for
   the RCD as required for certification (IEC 62109-2:2011). The default value for
   electrocution protection is 30mA,and for slow rising current is 300mA.
•  If an external RCD is required by local regulations,check which type of RCD is
   required for relevant electric code. It recommends using a type-A RCD. The 
   recommended RCD values is 100mA or 300mA unless a lower value is required
   by the specific local electric codes.When required by local regulations,the use
   of an RCD type B is permitted.

High leakage current!
Earth connection essential before connecting supply.

WARNING

!

•  Incorrect grounding can cause physical injury, death or equipment malfunction
   and increase electromagnetic.
•  Make sure that grounding conductor is adequately sized as required by safety
   regulations.
•  Do not connect the ground terminals of the unit in series in case of a multiple
   installation. This product can cause current with a d.c component, Where a residual
   current operated protective (RCD) or monitoring (RCM) device is used for protection
   in case of direct or indirect contact, only an RCD or RCM of type B is allowed
   on the supply side of this product.
  

For United Kingdom

•   The installation that connects the equipment to the supply terminals shall 
    comply with the requirements of BS 7671.
•   Electrical installation of PV system shall comply with requirements of BS 7671 
    and IEC 60364-7-712.
•   No protection settings can be altered.
•   User shall ensure that equipment is so installed, designed and operated to
    maintain at all times compliance with the requirements of ESQCR22(1)(a). 
  

For Australia and New Zealand

•   Electrical installation and maintenance shall be conducted by licensed 
electrician and shall comply with Australia National Wiring Rules.

09

08

2.3 Explanation of Symbols 

 

This section gives an explanation of all the symbols shown on the inverter and
on the type label.

Symbols on the Inverter

Symbol

Explanation

Operating Display.

Communication is active.

An error has occurred, please inform your installer immediately.

Symbols on the Type Label

Symbol

Explanation

CE mark.
The inverter complies with the requirements of the applicable 
CE guildlines.

RCM remark.

SAA certification.

Beware of hot surface.

The inverter can become hot during operation. Avoid contact 

during operation.

Danger of high voltages.
Danger to life due to high voltages in the inverter!

Danger.
Risk of electric shock!

Observe enclosed documentation.

The inverter can not be disposed together with the household waste. 
Disposal information can be found in the enclosed documentation.

Do not operate this inverter until it is isolated from mains 
and on-site PV generation suppliers.

Danger to life due to high voltage.

There is residual voltage in the inverter which needs 5 min to 

discharge.

•  Wait 5 min before you open the upper lid or the DC lid.

Safety

Safety

RoHS certificate

The inverter complies with the requirements of Restriction of

Hazardous Substances.

Содержание X3 series

Страница 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partially or fully copy including software etc and no reproduction or distribution of...

Страница 2: ...ter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing List 5 3 Installation Prec...

Страница 3: ...rmation appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situa...

Страница 4: ...nd of the DC cabling and at the array located between the inverter and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V an additional SPD type 3 require...

Страница 5: ...tion and that wire is not undersized Do not disassemble any parts of inverter which are not mentioned in installation guide It contains no user serviceable parts See Warranty for instructions on obtai...

Страница 6: ...all comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered User shall ensure t...

Страница 7: ...configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is re...

Страница 8: ...t power factor Feed in phase 8000 8800 11 6 12 8 Object A DC Switch optional Pocket WiFi Lan GPRS all optional DRM Smart plug optional AC Connector B C D E F G H I J Description Waterproof plug RS 485...

Страница 9: ...w MAINS PV Forced air ow 45dB WIFI optional Lan optional GPRS optional Meter optional USB DRM RS485 5 10 optional 5 Installation 5 1 Check for Transport Damage 5 2 Packing List Make sure the inverter...

Страница 10: ...cket on the wall Step 2 Match the inverter with wall bracket Below tools are needed before installation Installation tools crimping pliers for binding post and RJ 45 screwdriver stripping pliers wire...

Страница 11: ...N X3 15 0P T N is purchased X3 8 0P T N X3 8 0P T D X3 10 0P T N X3 10 0P T D X3 12 0P T N X3 12 0P T D X3 15 0P T N X3 15 0P T D Danger Danger to life due to high voltage on DC conductors when expose...

Страница 12: ...8mm The parameters have some differences because of different environment and material Please according to the local conditions to choose appropriate cable and micro breaker X3 8 0P T N X3 8 0P T D X3...

Страница 13: ...d in the end use system connectors cables junction box switch ger etc and the reverse current PV modules shall be considered based on the feedback current and reverse current The direct current DC cir...

Страница 14: ...onal three phase meter Load X3 series inverter 1 Prepare RJ45 connector and a communication cable 2 Trip the insulation from the communication cable 3 Let the communication cable pass though the water...

Страница 15: ...DSP 618 00103 00_MIC_DSP_Vx xx_xxxxxxxx hex Upgrade Steps Update ARM DSP 3 then insert U disk into the USB port on the bottom of the inverter Then turn on DC switch or connect the PV connector the LCD...

Страница 16: ...time to start up Above steps are for the regular start of the inverter If it is the first time to start up the inverter you need to setup the inverter 6 Operation Method 6 1 Control panel Below is the...

Страница 17: ...nterface User can select interface by moving the cursor with function button and press OK to confirm Status The status function contains three aspects of the inverter grid solar and load Press up and...

Страница 18: ...y country VDE4105 Load L1 Power 0W Setting If inputting the installer password the information of the LCD interface is as below a Safety The user can set the safety standard here According to differen...

Страница 19: ...r down button Press OK to confirm and alternate to next word After word is confirmed press OK to reset the password New Password 1 2 3 4 34 35 Operation Method Operation Method e RF Control RF Control...

Страница 20: ...ive standard curve cos f P For VDE ARN 4105 curve cos f P should refer to curve A default values of setting are as shown in curve A For E 8001 curve cos f P should refer to curve B default values of s...

Страница 21: ...nd press OK to confirm the selection press ESC to return to Menu a Inverter Yield The inverter yield function contains energy generated by today yesterday this month last month and total Press up and...

Страница 22: ...nnect them Or seek help form us if can not go back to normal state PV connection setting fault Disconnect PV and PV reconnect them Or seek help form us if can not go back to normal state EEPROM readin...

Страница 23: ...n shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and a...

Страница 24: ...owing requirements Suitable for loads more than 30 kg With handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C...

Отзывы: