Solax X3 series Скачать руководство пользователя страница 5

2.2 Important Safety Instructions

Danger!
Danger to life due to high voltages in the inverter!

All work  must be carried out by qualified electrician.
The appliance is not to be used by children or persons with                  
reduced physical sensory or mental capabilities, or lack of 
experience and knowledge, unless they have been given 
supervision or instruction.
Children should be supervised to ensure that they do not play 
with the appliance.

Caution

!

Danger of burn injuries due to hot enclosure parts!

During operation, the upper lid of the enclosure and the 
enclosure body may become hot.
  If  necessary,  touch  the  lower  temperature

enclosure  lid  during 

operation.

Caution

!

Possible damage to health as a result of the effects of radiation!

Do not stay closer than 20 cm to inverter for any length of time.

Note

!

Grounding the PV generator. 

Comply with the local requirements for grounding the PV
modules and  the PV generator. SolaX recommends connecting     
the generator frame and other electrically conductive surfaces 
in order to ensure continuous conduction and ground .

 

Warning

!

Ensure  input  DC  voltage  ≤Max.  DC  voltage  .Over  voltage 
may  cause  permanent  damage  to  inverter  or  other  losses, 
which will not be included in warranty! 

Warning

Authorized  service  personnel  must  disconnect  both  AC  and 
DC  power from  X3  series  before  attempting any  maintenance 
or  cleaning  or  working  on  any  circuits  connected  to  the  X3 
series.

Prior to the application, please read this section carefully to ensure correct 
and safe application. Please keep the user manual properly.
Use  only  attachments  recommended  or  sold  by  SolaX.  Otherwise  may 
result in a risk of fire, electric shock, or injury to person.
Make  sure  that  existing  wiring  is  in  good  condition  and  that  wire  is  not 
undersized. 
Do  not  disassemble  any  parts  of  inverter  which  are  not  mentioned  in 
installation  guide.  It  contains  no  user-serviceable  parts.  See  Warranty  for 
instructions  on  obtaining  service.  Attempting  to  service  the  X3  Series 
inverter  yourself  may  result  in  a  risk  of  electric  shock  or  fire  and  will  void 
your warranty. 
Keep away from flammable, explosive materials to avoid fire disaster.
The installation place should be away from humid or corrosive substance.
Authorized  service  personnel  must  use  insulated  tools  when  installing  or 
working with this equipment.
PV modules shall have an IEC 61730 class A rating.
Never touch either the positive or negative pole of PV connecting device.

 

Strictly prohibit touching both of them at the same time.

 

The unit contains capacitors that remain charged to a potentially lethal voltage
after the MAINS and PV supply have been disconnected.
Hazardous voltage will present for up to 5 minutes after disconnection from 
power supply.
CAUTION-RISK of electric shock from energy stored in capacitor,. Never operate 
on the solar inverter couplers,  The MAINS cables, PV cables or the PV generator 
when power is applied. After switching off the PV  and Mains, always wait for 
5minutes to let the intermediate circuit capacitors discharge before you unplug 
DC and MAINS couplers.
When accessing  the internal circuit of solar inverter, it is very important to wait 
45minutes before operating the  power circuit or demounting the electrolyte 
capacitors inside the device. Do not open the device before hand since the 
capacitors

time to sufficiently discharge!

 require 

Measure the voltage between terminals UDC+ and UDC- with a multi-meter 
(impedance at least 1Mohm) to ensure that the device is discharged before
beginning work (35VDC) inside the device.

Safety

Safety

07

06

Do not operate the  inverter when the device is running.

WARNING

!

Risk of electric shock!

WARNING

!

Содержание X3 series

Страница 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partially or fully copy including software etc and no reproduction or distribution of...

Страница 2: ...ter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing List 5 3 Installation Prec...

Страница 3: ...rmation appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situa...

Страница 4: ...nd of the DC cabling and at the array located between the inverter and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V an additional SPD type 3 require...

Страница 5: ...tion and that wire is not undersized Do not disassemble any parts of inverter which are not mentioned in installation guide It contains no user serviceable parts See Warranty for instructions on obtai...

Страница 6: ...all comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered User shall ensure t...

Страница 7: ...configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is re...

Страница 8: ...t power factor Feed in phase 8000 8800 11 6 12 8 Object A DC Switch optional Pocket WiFi Lan GPRS all optional DRM Smart plug optional AC Connector B C D E F G H I J Description Waterproof plug RS 485...

Страница 9: ...w MAINS PV Forced air ow 45dB WIFI optional Lan optional GPRS optional Meter optional USB DRM RS485 5 10 optional 5 Installation 5 1 Check for Transport Damage 5 2 Packing List Make sure the inverter...

Страница 10: ...cket on the wall Step 2 Match the inverter with wall bracket Below tools are needed before installation Installation tools crimping pliers for binding post and RJ 45 screwdriver stripping pliers wire...

Страница 11: ...N X3 15 0P T N is purchased X3 8 0P T N X3 8 0P T D X3 10 0P T N X3 10 0P T D X3 12 0P T N X3 12 0P T D X3 15 0P T N X3 15 0P T D Danger Danger to life due to high voltage on DC conductors when expose...

Страница 12: ...8mm The parameters have some differences because of different environment and material Please according to the local conditions to choose appropriate cable and micro breaker X3 8 0P T N X3 8 0P T D X3...

Страница 13: ...d in the end use system connectors cables junction box switch ger etc and the reverse current PV modules shall be considered based on the feedback current and reverse current The direct current DC cir...

Страница 14: ...onal three phase meter Load X3 series inverter 1 Prepare RJ45 connector and a communication cable 2 Trip the insulation from the communication cable 3 Let the communication cable pass though the water...

Страница 15: ...DSP 618 00103 00_MIC_DSP_Vx xx_xxxxxxxx hex Upgrade Steps Update ARM DSP 3 then insert U disk into the USB port on the bottom of the inverter Then turn on DC switch or connect the PV connector the LCD...

Страница 16: ...time to start up Above steps are for the regular start of the inverter If it is the first time to start up the inverter you need to setup the inverter 6 Operation Method 6 1 Control panel Below is the...

Страница 17: ...nterface User can select interface by moving the cursor with function button and press OK to confirm Status The status function contains three aspects of the inverter grid solar and load Press up and...

Страница 18: ...y country VDE4105 Load L1 Power 0W Setting If inputting the installer password the information of the LCD interface is as below a Safety The user can set the safety standard here According to differen...

Страница 19: ...r down button Press OK to confirm and alternate to next word After word is confirmed press OK to reset the password New Password 1 2 3 4 34 35 Operation Method Operation Method e RF Control RF Control...

Страница 20: ...ive standard curve cos f P For VDE ARN 4105 curve cos f P should refer to curve A default values of setting are as shown in curve A For E 8001 curve cos f P should refer to curve B default values of s...

Страница 21: ...nd press OK to confirm the selection press ESC to return to Menu a Inverter Yield The inverter yield function contains energy generated by today yesterday this month last month and total Press up and...

Страница 22: ...nnect them Or seek help form us if can not go back to normal state PV connection setting fault Disconnect PV and PV reconnect them Or seek help form us if can not go back to normal state EEPROM readin...

Страница 23: ...n shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and a...

Страница 24: ...owing requirements Suitable for loads more than 30 kg With handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C...

Отзывы: