Connection Steps

Grid Connection

Ø

X3 series inverter are designed for three phase grid. Rated grid voltage is 230V, 
frequency is 50/60Hz. Other technical requests should comply with the 
requirement of the local public grid.

Micro-breaker should be installed between inverter and grid, any loads 
should not be connected with inverter directly.

a)  Check the grid voltage and compare with the permissive voltage range (refer 
to technical data).
b)  Disconnect the circuit-bricker from all the phases and secure against re-
connection.
c)  Trip the wires:
     - Trip all the wires to 52.5mm and the PE wire to 55mm.
     - Use the crimping pliers to trip 12mm of insulation from wire ends as below.

Table 4   Cable and Micro-breaker recommended 

Incorrect Connection  between Load and Inverter

R,S,T,N Cable

IBMU

PE Cable

4

-

5mm

²

20

21

Installation 

Installation 

Model

6

-

8mm

²

*The parameters have some differences because of different environment and material. Please 
according to the local conditions to choose appropriate cable and micro-breaker.  

X3-8.0P-T-N

X3-8.0P-T-D

X3-10.0P-T-N

X3-10.0P-T-D

R

S

T

X3-12.0P-T-N

X3-12.0P-T-D

X3-15.0P-T-N

X3-15.0P-T-D

6

-

8mm

²

6

-

8mm

²

d)  Separate the AC plug into three parts as below.
      - Hold the middle part of the male insert, rotate the back shell to  
        loose it, and datach it from male inset.
      - Remove the cable nut (with rubber insert) from the back shell.

e)  Slide the cable nut and then back shell onto the cable. 

f )  Insert the tripped end of each five wires into the appropriate hole in the 
male insert, and then tight each screw (to tight each wire in place).(Use 
the accompanying inner hexagon spanner)

g)  Tighten the screw of the back shell and the male insert.

h)  Tighten the screw of the back shell and the cable nut.

I)  Align the groove of male terminal with the convex of female terminal , 
then tighten the bush in male terminal.

Micro-breaker

20A

25A

32A

32A

2

.

5

-

5mm

²

2

.

5

-

8mm

²

2

.

5

-

8

mm

²

2

.

5

-

8

mm

²

Содержание X3 series

Страница 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partially or fully copy including software etc and no reproduction or distribution of...

Страница 2: ...ter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing List 5 3 Installation Prec...

Страница 3: ...rmation appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situa...

Страница 4: ...nd of the DC cabling and at the array located between the inverter and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V an additional SPD type 3 require...

Страница 5: ...tion and that wire is not undersized Do not disassemble any parts of inverter which are not mentioned in installation guide It contains no user serviceable parts See Warranty for instructions on obtai...

Страница 6: ...all comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered User shall ensure t...

Страница 7: ...configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is re...

Страница 8: ...t power factor Feed in phase 8000 8800 11 6 12 8 Object A DC Switch optional Pocket WiFi Lan GPRS all optional DRM Smart plug optional AC Connector B C D E F G H I J Description Waterproof plug RS 485...

Страница 9: ...w MAINS PV Forced air ow 45dB WIFI optional Lan optional GPRS optional Meter optional USB DRM RS485 5 10 optional 5 Installation 5 1 Check for Transport Damage 5 2 Packing List Make sure the inverter...

Страница 10: ...cket on the wall Step 2 Match the inverter with wall bracket Below tools are needed before installation Installation tools crimping pliers for binding post and RJ 45 screwdriver stripping pliers wire...

Страница 11: ...N X3 15 0P T N is purchased X3 8 0P T N X3 8 0P T D X3 10 0P T N X3 10 0P T D X3 12 0P T N X3 12 0P T D X3 15 0P T N X3 15 0P T D Danger Danger to life due to high voltage on DC conductors when expose...

Страница 12: ...8mm The parameters have some differences because of different environment and material Please according to the local conditions to choose appropriate cable and micro breaker X3 8 0P T N X3 8 0P T D X3...

Страница 13: ...d in the end use system connectors cables junction box switch ger etc and the reverse current PV modules shall be considered based on the feedback current and reverse current The direct current DC cir...

Страница 14: ...onal three phase meter Load X3 series inverter 1 Prepare RJ45 connector and a communication cable 2 Trip the insulation from the communication cable 3 Let the communication cable pass though the water...

Страница 15: ...DSP 618 00103 00_MIC_DSP_Vx xx_xxxxxxxx hex Upgrade Steps Update ARM DSP 3 then insert U disk into the USB port on the bottom of the inverter Then turn on DC switch or connect the PV connector the LCD...

Страница 16: ...time to start up Above steps are for the regular start of the inverter If it is the first time to start up the inverter you need to setup the inverter 6 Operation Method 6 1 Control panel Below is the...

Страница 17: ...nterface User can select interface by moving the cursor with function button and press OK to confirm Status The status function contains three aspects of the inverter grid solar and load Press up and...

Страница 18: ...y country VDE4105 Load L1 Power 0W Setting If inputting the installer password the information of the LCD interface is as below a Safety The user can set the safety standard here According to differen...

Страница 19: ...r down button Press OK to confirm and alternate to next word After word is confirmed press OK to reset the password New Password 1 2 3 4 34 35 Operation Method Operation Method e RF Control RF Control...

Страница 20: ...ive standard curve cos f P For VDE ARN 4105 curve cos f P should refer to curve A default values of setting are as shown in curve A For E 8001 curve cos f P should refer to curve B default values of s...

Страница 21: ...nd press OK to confirm the selection press ESC to return to Menu a Inverter Yield The inverter yield function contains energy generated by today yesterday this month last month and total Press up and...

Страница 22: ...nnect them Or seek help form us if can not go back to normal state PV connection setting fault Disconnect PV and PV reconnect them Or seek help form us if can not go back to normal state EEPROM readin...

Страница 23: ...n shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and a...

Страница 24: ...owing requirements Suitable for loads more than 30 kg With handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C...

Отзывы: