Troubleshooting

Troubleshooting

● 

If the information panel doesn’t display the Fault light, check the following list 

to make sure that the present state of the installation allows proper operation 
of the unit.

— Is the inverter located in a clean, dry, adequately ventilated place?
— Have the DC input breakers been opened? 
— Are the cables adequately sized and short enough?
— Are the input and output connections and wiring in good condition?
— Are the configurations settings correct for your particular installation?
— Are the display panel and the communications cable properly  
     connected and undamaged?

7.2 Routine maintenance

Contact SolaX Customer Service for further assistance. Please be prepared to 
describe details of your system installation and provide model and serial number 
of the unit.

Inverters do not need any maintenance or correction in most condition, but if 
the inverter often loses power due to overheating, this can be the following 
reason:

● 

The cooling fins on the rear of house are coverd by dirts.

Clean the cooling fins with a soft dry cloth or brush if necessary.

Only trained and authorized professional personnel who are familiar with the 
requirements of safety was allowed to perform servicing and maintenance 
work.

► 

Safety checks

Safety checks should be performed at least every 12 months by manufacturer's 
qualified person who has adequate training, kownledge, and practical experience 
to perform these tests. The data should be recorded in an equipment log. If the 
device is not functioning properly or fails any of test, the device has to be 
repaired. For safety check details, refer to this manual, section 2 Safety instruction 
and EC Directives.

Maintain periodically

Only qualified person may perform the following works.
During the process of using the inverter, the manage person shall examine 
and maintain the machine regularly. The concrete operations are follow.
1: Check that if the cooling fins on the rear of house are covered by dirts,
and the machine should be cleaned and absorbed dust when necessary.
This work shall be check time to time.
2: Check that if the indicators of the inverter are in normal state, check if the 
keys of the inverter are in normal state, check if the display of the inverter is 
normal. This check should be performed at least every 6 months.
3: Check that if the input and output wires are damaged or aged. This check 
should be performed at least every 6 months.
4: You should get the inverter panels cleaned and their security checked at 
least every 6 months.

Inv OCP Fault

DCI OCP Fault

PV  Volt Fault

Isolation Fault

Temp Over Fault

RC Fault

SW OCP Fault

Mgr EEPROM Fault

RTC Fault

Meter Fault

Other device Fault

AC10M Volt Fault

Inverter over current protection fault
-Wait for a while to check if back to normal.
-Or seek help from us.

DCI over current protection Fault
-Wait for a while to check if back to normal.
-Or seek help from us.

PV Voltage Fault
-Check the connection of the inverter.
-Or seek help from us.

Isolation Fault
-Check the connection of the inverter.
-Or seek help from us.

Temp over the limitation
-Check if the environment temperature is over 
limitation.
-Or seek help from us.

Residual current over the limition
-Wait for a while to check if back to normal.
-Or seek help from us.

AC10Minute overvoltage Fault
System will reconnect if the utility is back to normal.
Or seek help from us.

Other device Fault
-Turn off the PV and grid,reconnect them.
-Or seek help form us.

Meter Fault
-Check if the meter is connected properly.
-Check if the meter set normally.
-Or seek help form us.

Manager EEPROM Fault
-Turn off the PV and grid,reconnect them.
-Or seek help form us.

RTC Fault
-Turn off the PV and grid

,

reconnect them.

-Or seek help form us.

Over Current Fault detected by software
-Wait for a while to check if go back to normal status.
-Or seek help form us.

Содержание X3 series

Страница 1: ...ual belongs to Solax Power Network Technology Zhe jiang Co Ltd Any corporation or individual should not plagiarize partially or fully copy including software etc and no reproduction or distribution of...

Страница 2: ...ter 3 3 Dimension 4 Technical Data 4 1 DC Input 4 2 AC Output 4 3 Efficiency Safety and Protection 4 4 General Data 5 Installation 5 1 Check for Transport Damage 5 2 Packing List 5 3 Installation Prec...

Страница 3: ...rmation appear in this document as described below Danger Danger indicates a hazardous situation which if not avoided will result in death or serious injury Warning Warning indicates a hazardous situa...

Страница 4: ...nd of the DC cabling and at the array located between the inverter and the PV generator if the voltage protection level VP of the surge arresters is greater than 1100V an additional SPD type 3 require...

Страница 5: ...tion and that wire is not undersized Do not disassemble any parts of inverter which are not mentioned in installation guide It contains no user serviceable parts See Warranty for instructions on obtai...

Страница 6: ...all comply with the requirements of BS 7671 Electrical installation of PV system shall comply with requirements of BS 7671 and IEC 60364 7 712 No protection settings can be altered User shall ensure t...

Страница 7: ...configuring system correctly including using the specified wires The system must be installed only by professional assemblers who are familiar with requirements for safety and EMC The assembler is re...

Страница 8: ...t power factor Feed in phase 8000 8800 11 6 12 8 Object A DC Switch optional Pocket WiFi Lan GPRS all optional DRM Smart plug optional AC Connector B C D E F G H I J Description Waterproof plug RS 485...

Страница 9: ...w MAINS PV Forced air ow 45dB WIFI optional Lan optional GPRS optional Meter optional USB DRM RS485 5 10 optional 5 Installation 5 1 Check for Transport Damage 5 2 Packing List Make sure the inverter...

Страница 10: ...cket on the wall Step 2 Match the inverter with wall bracket Below tools are needed before installation Installation tools crimping pliers for binding post and RJ 45 screwdriver stripping pliers wire...

Страница 11: ...N X3 15 0P T N is purchased X3 8 0P T N X3 8 0P T D X3 10 0P T N X3 10 0P T D X3 12 0P T N X3 12 0P T D X3 15 0P T N X3 15 0P T D Danger Danger to life due to high voltage on DC conductors when expose...

Страница 12: ...8mm The parameters have some differences because of different environment and material Please according to the local conditions to choose appropriate cable and micro breaker X3 8 0P T N X3 8 0P T D X3...

Страница 13: ...d in the end use system connectors cables junction box switch ger etc and the reverse current PV modules shall be considered based on the feedback current and reverse current The direct current DC cir...

Страница 14: ...onal three phase meter Load X3 series inverter 1 Prepare RJ45 connector and a communication cable 2 Trip the insulation from the communication cable 3 Let the communication cable pass though the water...

Страница 15: ...DSP 618 00103 00_MIC_DSP_Vx xx_xxxxxxxx hex Upgrade Steps Update ARM DSP 3 then insert U disk into the USB port on the bottom of the inverter Then turn on DC switch or connect the PV connector the LCD...

Страница 16: ...time to start up Above steps are for the regular start of the inverter If it is the first time to start up the inverter you need to setup the inverter 6 Operation Method 6 1 Control panel Below is the...

Страница 17: ...nterface User can select interface by moving the cursor with function button and press OK to confirm Status The status function contains three aspects of the inverter grid solar and load Press up and...

Страница 18: ...y country VDE4105 Load L1 Power 0W Setting If inputting the installer password the information of the LCD interface is as below a Safety The user can set the safety standard here According to differen...

Страница 19: ...r down button Press OK to confirm and alternate to next word After word is confirmed press OK to reset the password New Password 1 2 3 4 34 35 Operation Method Operation Method e RF Control RF Control...

Страница 20: ...ive standard curve cos f P For VDE ARN 4105 curve cos f P should refer to curve A default values of setting are as shown in curve A For E 8001 curve cos f P should refer to curve B default values of s...

Страница 21: ...nd press OK to confirm the selection press ESC to return to Menu a Inverter Yield The inverter yield function contains energy generated by today yesterday this month last month and total Press up and...

Страница 22: ...nnect them Or seek help form us if can not go back to normal state PV connection setting fault Disconnect PV and PV reconnect them Or seek help form us if can not go back to normal state EEPROM readin...

Страница 23: ...n shall examine and maintain the machine regularly The concrete operations are follow 1 Check that if the cooling fins on the rear of house are covered by dirts and the machine should be cleaned and a...

Страница 24: ...owing requirements Suitable for loads more than 30 kg With handle Can be fully closed 8 3 Storage and Transportation Store the inverter in dry place where ambient temperatures are always between 25 C...

Отзывы: