NOTE
Only the first and last SolarEdge devices in the chain should be terminated.
The other inverters in the chain should have the termination switch OFF
(down position).
11. If not using surge protection, connect the grounding wire to the first inverter in the
RS485 chain; make sure the grounding wire is not in contact with other wires. For
inverters with a Connection Unit, connect the grounding wire to the grounding bus-
bar in the Connection Unit.
Verifying the Connection
After connecting and configuring a communication option, perform the following
steps to check that the connection to the monitoring server has been successfully
established.
1. Go to
Commissioning > Status
.
2. In the Summary section, under
Server Comm.
, make sure
S_OK
is displayed
together with the selected communication option.
3. Scroll down to the
Communication
section and check that the communication
options are as required.
EV Charging Single Phase Inverter Guide MAN-01-00583-1.5
60
Verifying the Connection
Содержание SE3680H
Страница 90: ......