30 A
MP SUB
-
PANEL WIRING INSTRUCTIONS
NOTE: The sub-panel must be placed within 100 feet of the main electrical service panel, and between 5 and 50 feet away from the spa.
Refer to the wiring diagram below.
1. Connect the #10 AWG, WHITE [NEUTRAL] wire from the main electrical service panel to the sub-panel NEUTRAL bar.
2. Connect the #10 AWG, GREEN [GROUND] wire from the main electrical service panel to the sub-panel GROUND bar.
3. Connect the #10 AWG, BLACK [L1] wire from the main electrical service panel to the sub-panel [terminal L1].
4. Check the connections internal to the sub-panel and be sure that a pigtail wire exists between the neutral bar and the 30 amp
breaker. NEVER remove the pigtail wires!
17
™
Содержание DRAFT 00
Страница 1: ...Watkins Manufacturing Corporation OWNER S MANUAL...
Страница 60: ...NOTES 59...
Страница 61: ...NOTES 60...
Страница 65: ...Watkins Manufacturing Corporation OWNER S MANUAL...
Страница 66: ......
Страница 125: ...NOTES 59...
Страница 126: ...NOTES 60...