INSTALLATION - LABELLING
47
Label
Colour
Location
Black text
on
white background
Inverter AC isolator
Distribution board number to be entered by
installer i.e. DB1
White text
on
red background
Main switchboard and all
intermediate distribution
boards where inverter is
directly connected to a
distribution board
OR
Black and white
Prominent position adjacent
to the inverter
Black text
on
yellow background
Added below the shutdown
sign (Solahart PV Operating
Procedure)
Black text
on
yellow background
Prominent position adjacent
to the inverter
Содержание HSL60P6-PB-1-250
Страница 53: ...53 ENGINEERING CERTIFICATION ...
Страница 54: ...ENGINEERING CERTIFICATION 54 ...
Страница 59: ...59 This page has been intentionally left blank ...