INSTALLATION - RACKING 

28 

RAIL SUPPORT SPACING 

Use  the  following  tables  to  determine  the  rail  support  spacing  for  the  relevant  roof  type  based  on  the 
previously  determined  wind  region,  terrain  category,  roof  position  area  (Edge  Zone  or  Centre  Zone)  and 
maximum height of the installation. 
 

MAXIMUM RAIL SUPPORT SPACING TABLES 

 

Wind Region A 

Terrain Category 

Roof Area 

Edge Zone 

Centre Zone 

Edge Zone 

Centre Zone 

Roof Height (m) 

10 

10 

10 

10 

Tile Roof (Timber Rafters only) 

1200 

950 

1575 

1275 

1475 

1800 

Metal Roof with Timber Battens 

1505 

1247 

1700 

1600 

1675 

1800 

Metal Roof with Steel Battens 

1075 

890 

1523 

1261 

1432 

1800 

Tilt Legs – PV Module Angle 15° 

1325 

1025 

1500 

1254 

1400 

1575 

Tilt Legs – PV Module Angle 30° 

1089 

902 

1400 

1350 

1325 

1500 

 

Wind Region B 

Terrain Category 

Roof Area 

Edge Zone 

Centre Zone 

Edge Zone 

Centre Zone 

Roof Height (m) 

10 

10 

10 

10 

Tile Roof (Timber Rafters only) 

825 

675 

1100 

875 

1025 

1350 

Metal Roof with Timber Battens 

938 

777 

1329 

1101 

1250 

1759 

Metal Roof with Steel Battens 

670 

555 

949 

786 

893 

1265 

Tilt Legs – PV Module Angle 15° 

927 

768 

944 

782 

1235 

1257 

Tilt Legs – PV Module Angle 30° 

679 

562 

1078 

892 

904 

1435 

 

Wind Region C 

Terrain Category 

Roof Area 

Edge Zone 

Centre Zone 

Edge Zone 

Centre Zone 

Roof Height (m) 

10 

10 

10 

10 

Tile Roof (Timber Rafters only) 

525 

450 

700 

575 

650 

850 

Metal Roof with Timber Battens 

582 

526 

825 

745 

910 

735 

1289 

1042 

Metal Roof with Steel Battens 

416 

375 

589 

532 

650 

525 

921 

744 

Tilt Legs – PV Module Angle 15° 

576 

520 

586 

529 

850 

727 

915 

740 

Tilt Legs – PV Module Angle 30° 

421 

380 

669 

604 

658 

532 

1045 

845 

 
Roof interfaces must be fixed to rafters or purlins under the roof cladding. Screw minimum embedment into 
timber rafters is 50 mm and 35 mm for timber battens. 
 
Steel purlins must meet the following minimum requirements: 
 

Roof interface 

Minimum steel purlin specification 

Metal roof interface 

0.55 mm BMT 550 Grade or 0.75 mm BMT 450 Grade 

Tilt leg interface 

1.0 mm BMT 500 Grade 

 

Note: 

Screws  supplied  with  the  roof  interfaces  are  wood  screws  suitable  for  timber  only.  Screws  used  in 

metal purlins must be suitable for metal structures and have a TPI (threads per inch) of 14.

 

 

 

Содержание HSL60P6-PB-1-250

Страница 1: ...Solahart PV Systems must be installed and serviced by a suitably qualified person Please leave this guide with the PV system owner Owner s Guide and Installation Instructions Single Phase PV Systems ...

Страница 2: ...he installation guide supplied with the PV inverter Caution Only qualified and accredited personnel should perform work on PV systems such as design installation commissioning maintenance and repairs Be sure to follow the safety instructions for all system components It is also important to observe relevant local codes and regulations for health and safety and accident prevention Only Solahart par...

Страница 3: ...res 5 Electrical Safety 5 Periodic Maintenance 6 Wiring Diagrams 8 Installation Overview 19 Installation Procedure 21 Installation Planning 22 Installation Racking 27 Installation Wiring 34 Installation Rooftop Isolator 36 Installation PV Modules 37 Installation Inverter 42 Installation Labelling 46 Installation Commissioning 48 Engineering Certification 53 Solahart PV System Warranty Australia On...

Страница 4: ...ply is available from the grid Your Solahart PV System cannot provide a backup electricity supply to your home appliances if the mains supply is interrupted If the energy generated by the PV System is not sufficient to meet domestic demands the energy necessary to ensure the standard operation of the connected devices is drawn from the grid If the energy generated exceeds that required by property...

Страница 5: ...1800 638 011 or your nearest Solahart dealer ELECTRICAL SAFETY SAFETY REQUIREMENTS The voltages and currents produced by a single module or modules connected in series voltages are added together or in parallel currents are added together can be dangerous Note Only qualified personnel should perform work on photovoltaic systems UNIQUE HAZARDS OF DC ELECTRICITY PV modules generate DC electricity as...

Страница 6: ... and communication has been maintained Monthly If you are unable to log in or your system is not operating correctly contact your Solahart dealer Visual inspection of PV system components from ground level to check for Quarterly Accumulation of debris around components Gently remove debris from components that are safely accessible from ground level Shading of the array Trim trees if required Visi...

Страница 7: ...nnections are tight secure and free of corrosion Cables are not damaged in any way Earthing of the modules and module rails is satisfactory Electrical characteristics are within specification The AC and DC isolator circuit breakers function correctly ...

Страница 8: ... 1020 8 95 150 4 5 1 5 1250 8 79 188 5 1275 8 95 188 0 6 1 6 1500 8 79 226 2 1530 8 95 225 6 7 1 7 1750 8 79 263 9 1785 8 95 263 2 Values measured at standard test conditions STC defined as irradiance of 1000 W m2 Spectrum AM 1 5 and cell temperature 25ºC Variations from STC values will affect actual Isc and Voc and should be allowed for For earthing arrangement and wiring diagram refer to Earthin...

Страница 9: ...g W Isc A Voc V 6 1 6 1500 8 79 226 2 1530 8 95 225 6 7 1 7 1750 8 79 263 9 1785 8 95 263 2 Values measured at standard test conditions STC defined as irradiance of 1000 W m2 Spectrum AM 1 5 and cell temperature 25ºC Variations from STC values will affect actual Isc and Voc and should be allowed for For earthing arrangement and wiring diagram refer to Earthing Arrangements All Systems on page 18 ...

Страница 10: ...8 79 263 9 1785 8 95 263 2 8 1 8 2000 8 79 301 6 2040 8 95 300 8 9 1 9 2250 8 79 339 3 2295 8 95 338 4 10 1 10 2500 8 79 377 0 2550 8 95 376 0 Values measured at standard test conditions STC defined as irradiance of 1000 W m2 Spectrum AM 1 5 and cell temperature 25ºC Variations from STC values will affect actual Isc and Voc and should be allowed for For earthing arrangement and wiring diagram refe...

Страница 11: ... 2250 8 79 339 3 2295 8 95 338 4 10 1 10 2500 8 79 377 0 2550 8 95 376 0 11 1 11 2750 8 79 414 7 2805 8 95 413 6 12 1 12 3000 8 79 452 4 3060 8 95 451 2 13 1 13 3250 8 79 490 1 3315 8 95 488 8 Values measured at standard test conditions STC defined as irradiance of 1000 W m2 Spectrum AM 1 5 and cell temperature 25ºC Variations from STC values will affect actual Isc and Voc and should be allowed fo...

Страница 12: ...5 8 95 413 6 12 1 12 3000 8 79 452 4 3060 8 95 451 2 13 1 13 3250 8 79 490 1 3315 8 95 488 8 14 1 14 3500 8 79 527 8 3570 8 95 526 4 10 2 5 5 2500 8 79 Refer to string voltages listed above 2550 8 95 Refer to string voltages listed above 11 2 5 6 2750 8 79 2805 8 95 12 2 5 7 6 6 3000 8 79 3060 8 95 13 2 5 8 6 7 3250 8 79 3315 8 95 14 2 5 9 6 8 7 7 3500 8 79 3570 8 95 Values measured at standard te...

Страница 13: ...8 79 414 7 2805 8 95 413 6 12 1 12 3000 8 79 452 4 3060 8 95 451 2 13 1 13 3250 8 79 490 1 3315 8 95 488 8 14 1 14 3500 8 79 527 8 3570 8 95 526 4 12 2 6 6 3000 8 79 Refer to string voltages listed above 3060 8 95 Refer to string voltages listed above 13 2 6 7 3250 8 79 3315 8 95 14 2 6 8 7 7 3500 8 79 3570 8 95 Values measured at standard test conditions STC defined as irradiance of 1000 W m2 Spe...

Страница 14: ...11 2750 8 79 414 7 2805 8 95 413 6 12 1 12 3000 8 79 452 4 3060 8 95 451 2 15 2 6 9 7 8 3750 8 79 Refer to string voltages listed above 3825 8 95 Refer to string voltages listed above 16 2 6 10 7 9 8 8 4000 8 79 4080 8 95 17 2 6 11 7 10 8 9 4250 8 79 4335 8 95 18 2 6 12 7 11 8 10 9 9 4500 8 79 4590 8 95 Values measured at standard test conditions STC defined as irradiance of 1000 W m2 Spectrum AM ...

Страница 15: ... 79 414 7 2805 8 95 413 6 12 1 12 3000 8 79 452 4 3060 8 95 451 2 13 1 13 3250 8 79 490 1 3315 8 95 488 8 15 2 5 10 6 9 7 8 3750 8 79 Refer to string voltages listed above 3825 8 95 Refer to string voltages listed above 16 2 5 11 6 10 7 9 8 8 4000 8 79 4080 8 95 17 2 5 12 6 11 7 10 8 9 4250 8 79 4335 8 95 18 2 5 13 6 12 7 11 8 10 9 9 4500 8 79 4590 8 95 Values measured at standard test conditions ...

Страница 16: ... 8 95 451 2 13 1 13 3250 8 79 490 1 3315 8 95 488 8 14 1 14 3500 8 79 527 8 3570 8 95 526 4 18 2 5 13 6 12 7 11 8 10 9 9 4500 8 79 Refer to string voltages listed above 4590 8 95 Refer to string voltages listed above 19 2 5 14 6 13 7 12 8 11 9 10 4750 8 79 4845 8 95 20 2 6 14 7 13 8 12 9 11 10 10 5000 8 79 5100 8 95 21 2 7 14 8 13 9 12 10 11 5250 8 79 5355 8 95 22 2 8 14 9 13 10 12 11 11 5500 8 79...

Страница 17: ... 13 3250 8 79 490 1 3315 8 95 488 8 14 1 14 3500 8 79 527 8 3570 8 95 526 4 18 2 6 12 7 11 8 10 9 9 4500 8 79 Refer to string voltages listed above 4590 8 95 Refer to string voltages listed above 19 2 6 13 7 12 8 11 9 10 4750 8 79 4845 8 95 20 2 6 14 7 13 8 12 9 11 10 10 5000 8 79 5100 8 95 21 2 7 14 8 13 9 12 10 11 5250 8 79 5355 8 95 22 2 8 14 9 13 10 12 11 11 5500 8 79 5610 8 95 Values measured...

Страница 18: ... Earthing on page 38 for more information Warning Do not drill holes in the modules as this will void product warranty The racking may be earthed by means of a rooftop isolator bracket Refer to Installation Rooftop Isolator on page 36 for details Where it is necessary to make an earthing connection to a rail that does not have a rooftop isolator bracket fitted a rail splice piece will provide a su...

Страница 19: ...ended that the system is shielded with an opaque cover during installation maintenance or repair work INSTALLER RESPONSIBILITIES The installer is solely responsible for Observing and conforming to all relevant Australian Standards all relevant Clean Energy Council Accreditation guidelines and all applicable laws ordinances regulations codes of practice and local or national building codes includin...

Страница 20: ... be mounted over a fire retardant roof covering rated for the application ENVIRONMENTAL FACTORS Solahart s limited warranty is based upon modules being installed in accordance with the following conditions Modules are not suitable for installation in potentially hazardous locations Modules should not be installed in locations close to fire or combustible materials where there is potential for extr...

Страница 21: ...Roof Type d Roof Area e Building Height f Array Orientation 3 Install the Racking Rail and Rail Supports Refer to Installation Racking on page 27 4 Install the remainder of the roof top components as follows a Rooftop Isolator Refer to Installation Rooftop Isolator on page 36 b PV Modules Refer Installation PV Modules on page 36 c Rooftop Wiring Refer to Installation Wiring on page 34 5 Install th...

Страница 22: ...port is available Length of networking cable required from inverter to networking port Wi Fi access including SSID and password PV system owner s network administrator permission and assistance to adjust firewall network address translation NAT and port forwarding settings PV MODULE ORIENTATION AND INCLINATION To maximize system output install modules at optimum orientation and inclination tilt an...

Страница 23: ...tings including racking weighs approximately 25 kg LATITUDE OF SOME AUSTRALIAN CITIES Adelaide 35 S Cairns 17 S Hobart 42 S Port Hedland 20 S Alice Springs 24 S Canberra 35 S Mildura 34 S Rockhampton 24 S Brisbane 27 S Darwin 12 S Melbourne 38 S Sydney 34 S Broken Hill 31 S Geraldton 28 S Perth 32 S Townsville 19 S WIND REGION Use the wind region diagram shown below to determine the wind region of...

Страница 24: ...nstalled and select the appropriate rail support Rail support systems are available as follows Roof Type Roof Pitch Rail Support Category Rail Support Name Options Standard tile 10 30º Tile roof interface Tile interface Portrait Tile interface Landscape Low profile tile Flat tile interface Slate Slate interface Metal 10 30º Metal roof interface Metal roof interface Metal Corrugated 10 º or Latitud...

Страница 25: ...ed in portrait as per diagram For tilt leg systems row spacing must prevent shading of one row by another and needs to be calculated on an individual site basis taking into account orientation roof pitch and module inclination All dimensions are in mm unless otherwise stated Number of modules per row REC255PE 1 2 3 4 5 6 7 8 9 10 Number of rows H 1665 1665 1665 1665 1665 1665 1665 1665 1665 1665 1...

Страница 26: ...ed in portrait as per diagram For tilt leg systems row spacing must prevent shading of one row by another and needs to be calculated on an individual site basis taking into account orientation roof pitch and module inclination All dimensions are in mm unless otherwise stated Number of modules per row HSL60P6 PB 1 250 1 2 3 4 5 6 7 8 9 10 Number of rows H 1636 1636 1636 1636 1636 1636 1636 1636 163...

Страница 27: ... a Rail splices c Z modules with Allen head bolt Front rail leg foot d Adjustable tilt leg e Wood Screws M6x90 Overview of components for 30º fixed tilt legs Rail a Rail splice c Z modules with Allen head bolts Front rail leg foot d Fixed tilt leg e Wood Screws M6x90 Note Screws must be fit for purpose e g screws used in metal purlins must be suitable for metal structures and have a TPI threads pe...

Страница 28: ...1250 1759 Metal Roof with Steel Battens 670 555 949 786 893 1265 Tilt Legs PV Module Angle 15 927 768 944 782 1235 1257 Tilt Legs PV Module Angle 30 679 562 1078 892 904 1435 Wind Region C Terrain Category 2 3 Roof Area Edge Zone Centre Zone Edge Zone Centre Zone Roof Height m 5 10 5 10 5 10 5 10 Tile Roof Timber Rafters only 525 450 700 575 650 850 Metal Roof with Timber Battens 582 526 825 745 9...

Страница 29: ...mm apart for HSL60P6 PB 1 250 modules RAIL OVERHANG Rail end overhang must be no greater than 50 of rail support spacing For example if rail support spacing is 1200 mm rail end overhang can be up to 600 mm In this case two rail support brackets can support a rail up to 2400 mm in length 1200 mm between brackets and 600 mm of overhang at each end Note Drawings not to scale Rail Spacing 833 1249 mm ...

Страница 30: ...lel with rafters If necessary pack underneath tile roof interfaces with timber Incorrect Correct 4 Warning Do not use tile roof interfaces as a climbing support as extreme loading of this point could cause damage to the tile below 5 For thin tiles such as slate shingles proceed directly to step 6 For thick tiles such as grooved tiles if necessary use an angle grinder to chase a recess or remove ra...

Страница 31: ...4 1 Determine and mark position of the metal roof interfaces according to your plans Pre drill through roof cladding on top of crest at planned locations Place the supplied rubber gasket under the metal roof interface and ensure that a weatherproof seal is made between the interface and the roof cladding 2 Fix the metal roof interface to the timber batten or rafter using the M6 x 90 mm screw suppl...

Страница 32: ... to ensure that the fastening screws tightly fix the sealing gaskets without damaging roof cladding Adjustable tilt leg foot 30º fixed tilt leg foot 3 Adjustable tilt legs only Insert feet U brackets into front feet and loosely fasten Allen head bolt and nut to allow for later adjustment Allen head bolt and Z module on top of U bracket is utilised to attach rails in next step 4 For adjustable tilt...

Страница 33: ...urns of Z module Allen head bolt The rail can then be freely moved along Z modules 3 Adjust the vertical and horizontal position of the rail by taking advantage of the long hole in the tile and metal roof interfaces and the still loose connection of the rail Z modules 4 Align all rail ends For adjustable tilt legs align the rail tilt orientation use a string line if necessary Tighten all previousl...

Страница 34: ...t and or voltage than that reported under STC When designing a system allow for increased output of a module as a result of conditions different to STC in accordance with the Clean Energy Council s Grid Connected Solar PV System Design Guidelines for Accredited Installers and AS NZS 5033 Ensure cables are fixed to the mounting structure and are not in contact with the roof or rear surface of modul...

Страница 35: ...ised type however for uniformity they should be wired as shown in the DC isolator wiring diagram below Warning DC isolator terminal screws must be tightened by hand only Do not use power tools DC isolator wiring diagram Once wired the DC isolator should be left in the open position until system commissioning ...

Страница 36: ...osure to prevent water ingress in adverse weather conditions If water and or condensation can form in the isolator enclosure provision must be made for its harmless escape through suitably located drainage points in accordance with AS NZS 3000 Clause 3 3 2 3 Conduit entering the isolator enclosure must have a drainage hole installed at the lowest point to facilitate the escape of any moisture Note...

Страница 37: ... top of each other HSL60P6 PB 1 250 modules only Keep all electrical contacts clean and dry Store modules in a dry and properly ventilated room Do not use sharp or pointed objects to mark module surface or module anodising Never apply paints adhesives or detergents to the rear laminate of the modules Never attempt to disassemble modules modify or adapt the modules or labels in any way as this will...

Страница 38: ...mplete the circuit by connecting the two string halves together by connecting the positive and negative cables of the two modules left previously disconnected in step 5 Note Modules may be connected in a different order provided that all modules in a string are connected in series Note The Rooftop DC Isolator should still be in the OFF position at the completion of this stage of the installation I...

Страница 39: ...s i e short edge horizontal modules must be installed so that the module junction box is located towards the top edge of the module Module cables must be installed so that any water will run away from the junction box Each corner of the module frame has small drainage holes to allow water caused by rain or snow melt to exit the frame easily and to minimize damage caused by freezing and thawing Ple...

Страница 40: ...e module and are at least 25 mm from the rail ends For end clamps with earthing plates ensure the frame of the module is located on top of the protrusions of the earthing plate Tighten end clamp bolts to 21 Nm 4 Place a mid clamp with Z module and Allen head bolt in each rail and slide into position Ensure that the mid clamp is tight against the module For mid clamps with earthing plates ensure th...

Страница 41: ... the rail ends In positions where earthing plates are required ensure the frame of module is located on top of the protrusions of the earthing plate Tighten end clamp bolts to 21 Nm 8 Repeat the steps 3 7 for each row of modules Mid clamps may be temporarily placed between rows to ensure 18 mm uniform spacing between rows Module installation is now complete ...

Страница 42: ...nsformer permitting the functional earthing of PV arrays The default factory setting negative pole to ground is the preferred grounding configuration to maintain maximum performance and should remain unaltered unless otherwise instructed by regulators or electricity network operators Incorrect configuration may cause damage to the system and photovoltaic panels Sealing plugs provided with the inve...

Страница 43: ...n accordance with AS NZS 5033 For common PVC PVC cable types operating at 75 C on a 230 V single phase circuit the following table provides for a voltage variation of less than 1 Inverter Model Conductor cross section 2 5 mm2 4 0 mm2 6 0 mm2 10 0 mm2 16 0 mm2 Maximum cable length m SB 1 5 1 VL 40 18 3 29 3 N A N A N A SB1600TL 10 18 3 N A N A N A N A UNO 2 0 I OUTD Refer Power One ABB Quick Instal...

Страница 44: ...ory installed in SB 1 5 1 VL 40 SB 2 5 1 VL 40 SB 3000TL 21 SB 4000TL 21 SB 5000 TL 21 and STP 5000TL 20 inverters with installation instructions for the Webconnect also provided with the inverters The Webconnect is a cable based type of communication based on the Ethernet standard The Webconnect enables the inverter to exchange data with SMA Sunny Portal which facilitates data monitoring and faul...

Страница 45: ... WIFI logger card as per supplied instructions 2 Commission the PV system as outlined in the Solahart Owner s Guide and Installation Instructions 3 Commission the WIFI logger card as per supplied instructions An internet connected and WIFI enabled laptop tablet or smartphone is required 4 During the commissioning procedure you will be asked to insert Aurora Vision access credentials Please enter t...

Страница 46: ... connected to a distribution board additional labels must also be placed on the main switchboard and all intermediate distribution boards The following table details labels that are supplied in Solahart PV Systems Label Colour Location White text on red background Prominent position on main switchboard White text on red background Main switch White text on red background Solar main switch if inver...

Страница 47: ...t on red background Main switchboard and all intermediate distribution boards where inverter is directly connected to a distribution board OR Black and white Prominent position adjacent to the inverter Black text on yellow background Added below the shutdown sign Solahart PV Operating Procedure Black text on yellow background Prominent position adjacent to the inverter ...

Страница 48: ...ments should be made under stable irradiance conditions close to solar noon if possible Where multiple strings are installed this test procedure must be repeated for each string The voltage measurement obtained should be the number of modules in the string multiplied by the Voc of one module i e for a string with 9 X REC255PE modules String Voc 9 X 35 3 V DC 318 V DC 1 Ensure that the Inverter AC ...

Страница 49: ...e OFF position 9 Reconnect string positive and negative DC plug connectors to inverter 10 Repeat for each string SOLAR ISOLATION DEVICE S TEST INVERTER DC ISOLATOR S This test is performed to ensure the Inverter DC Isolator s are isolating the string s from the inverter when in the OFF position 1 Ensure that the Inverter AC Isolator s is in the OFF position 2 Switch all string DC Isolators to the ...

Страница 50: ...ve up to 600 VDC present 8 Activate insulation tester The resistance measured must be greater than or equal to 1 MΩ 9 Switch the Inverter DC Isolator to the OFF position 10 Connect insulation tester leads between the disconnected negative string plug and earth Ensure test leads are firmly fixed in position 11 Switch the Inverter DC Isolator to the ON position Warning The positive and negative stri...

Страница 51: ...ingle string configurations with less than 7 modules the start voltage for the connected zone input IN1 or IN2 must be adjusted in order for the system to function correctly and efficiently The start voltage of the unused zone input may be left set to the factory preset voltage For dual string configurations and any string with less than 7 modules the start voltage for the connected zone input IN1...

Страница 52: ...r the number of modules in each string according to the following table Indicative String Vmp NOCT Number of modules in string 4 5 6 7 8 9 10 11 12 13 14 HSL60P6 PB 1 250 modules 110 138 166 193 221 248 276 304 331 359 386 REC255PE modules 114 143 171 200 228 257 285 314 342 371 399 Values measured at normal operating cell temperature NOCT defined as irradiance of 800 W m2 Spectrum AM 1 5 wind spe...

Страница 53: ...53 ENGINEERING CERTIFICATION ...

Страница 54: ...ENGINEERING CERTIFICATION 54 ...

Страница 55: ...ventative maintenance and advice on the operation of the PV System You can contact Solahart on 1800 638 011 to arrange a service call or to find out details about this warranty PART A MODULES Warranty coverage for the Module Subject to the terms and conditions of this Limited Warranty Solahart warrants that the Modules 1 Are free from defects in material and workmanship for a period of HSL60P6 PB ...

Страница 56: ...rrants that the racking system supplied with the PV System shall be free from defects in material and workmanship for a period of five 5 years from the date of installation This Warranty shall be void if installation of the racking system is not performed in accordance with the Owner s Guide and Installation Instructions or if the racking system has been modified repaired or reworked in a manner n...

Страница 57: ...e PV System and any insufficient framing if the PV System is a frameless module 9 insufficient ventilation of the device 10 failure to observe the applicable safety regulations or any factor identified in the Solahart Owner s Guide and Installation Instructions PV Systems 11 Ignoring safety warnings and instructions contained in all documents relevant to the PV System If your claim relates to a fa...

Страница 58: ... the consent of the owner to act on their behalf 2 Contact your Solahart dealer without undue delay after detection of the defect and in any event within the applicable warranty period p You are not entitled to make a claim under this warranty if your PV System 1 Does not have its original serial numbers and type plate or numbers are illegible or 2 Is not installed in Australia Warranty Claim Proc...

Страница 59: ...59 This page has been intentionally left blank ...

Страница 60: ...ed Office 1 Alan Street PO Box 6 Rydalmere New South Wales 2116 Australia For SERVICE Telephone 1800 638 011 or your nearest Solahart Dealer For Sales Telephone 1300 769 475 or your nearest Solahart Dealer www solahart com au Revision Date 2015 August 120018D ...

Отзывы: