
67
15. SETTING-OUT LINE
Setting-out line is used for setting out a required point at a designated distance
from the baseline and for finding the distance from the baseline to a measured
point.
To perform setting-out line measurement, first, define the baseline. The baseline
can be defined by inputting the coordinates of the two points. The scale factor
value is the difference between the input coordinates and the observed
coordinates.
• When not observing first or second points, scale factor is set to “1”.
• Defined baseline can be used in both setting-out line measurement and point
projection.
X
PROCEDURE
1. In the second page of Meas mode
screen, press
[MENU]
, then select
"Set-out line."
15.1
Defining Baseline
Scale (X, Y) = Hdist’ (horizontal distance calculated from the measured value)
Hdist (horizontal distance calculated from the input coordinates)
2nd Pt.
Cut
Fill
Grade
Z
E
Baseline
Offset
Length
Azimuth
N
1st Pt.
REM
Resection
Area calculation
Set-out line
Point projection
30R.book 67
ページ
2003年12月16日 火曜日 午後5時15分
Содержание 30R Series
Страница 8: ...vi 30R book vi ページ 2003年12月16日 火曜日 午後5時15分 ...
Страница 172: ...29 REGULATIONS 164 CE Conformity Declaration 30R_29 FM 164 ページ 2003年12月18日 木曜日 午後5時11分 ...
Страница 173: ...165 29 REGULATIONS 30R_29 FM 165 ページ 2003年12月18日 木曜日 午後5時11分 ...
Страница 177: ...30R book 1 ページ 2003年12月16日 火曜日 午後5時15分 ...
Страница 178: ...8th ed 13 0408 Printed in Japan 2002 SOKKIA CO LTD 30R_C3C4 FM 2 ページ 2004年8月23日 月曜日 午後5時43分 ...