background image

75-136KTL

User manual

Copyright © Shenzhen SOFARSOLAR Co., Ltd

- 18 -

After unpacking, please check according to following table, to see whether all the
parts were included in the packing, please contact your distributor immediately if
anything missing or damage.

Figure 4-1Components and mechanical parts that inside the package

No

Pictures

Description

Quantity

1

SOFAR 75-136KTL

1 pcs

2

Rear Panel

1 pcs

3

PV+ input connector

75KTL 16 pcs

80KTL 16 pcs

100KTL 20 pcs

110KTL 20 pcs

125KTL 20 pcs

136KTL 24pcs

4

PV- input connector

75KTL 16 pcs

80KTL 16 pcs

100KTL 20 pcs

110KTL 20 pcs

125KTL 20 pcs

136KTL 24 pcs

5

PV+ metal pin

75KTL 16 pcs

80KTL 16 pcs

100KTL 20 pcs

110KTL 20 pcs

125KTL 20 pcs

136KTL 24 pcs

6

PV- metal pin

75KTL 16 pcs

80KTL 16 pcs

100KTL 20 pcs

110KTL 20 pcs

125KTL 20 pcs

136KTL 24 pcs

136KTL 24 pcs

Содержание 100KTL

Страница 1: ...Shenzhen SOFAR SOLAR Co Ltd Solar Grid tied Inverter Product Model SOFAR 75K 136KTL User manual ...

Страница 2: ...5 4 6 Installation 27 5 Electrical Connection 32 5 1 Electrical Connection 33 5 2 Terminal Connector 33 5 3 Grounding Connection PE 34 5 4 Connect grid side of inverter AC Output 35 5 5 Connect PV side of inverter DC Input 41 5 6 Communication Connection 44 6 Commissioning of inverter 50 6 1 Cable Connection Inspection 50 6 2 Start Inverter 50 7 Operation interface 52 7 1 Operation and Display Pan...

Страница 3: ... operates the device at any time must operate in accordance with the requirements of this manual Copyright Declaration The copyright of this manual belongs to Shenzhen SOFARSOLAR Co Ltd Any corporation or individual should not plagiarize partially cope or fully copy including software etc not allow to duplication and publishment in any form and any way All rights reserved SOFARSOLAR reserves the r...

Страница 4: ...y can be performed by qualified electricians Symbols Used The following types of safety instruction and general information appear in this document as described below Danger indicates a hazardous situation which if not avoided will result in death or serious injury Danger Warning indicates a hazardous situation which if not avoided could result in death or serious injury Warning Caution indicates ...

Страница 5: ... with laws regulations codes and standards applicable in the jurisdiction Before installing and adjusting the produce please read all of instructions cautions and warnings in this manual Before connecting the product to the electrical utility grid contact the local utility company for allowance Also this connection must be made only by qualified electrician If the failure persists please contact t...

Страница 6: ... type label attach the side of product which contact important information and technical data the type label must permanent attached to the product SOFAR 75 136KTL has warming symbol attache the product which contact information of safety operation The warming symbol must permanent attached to the product Installation location requirement Please install the inverter according to the following sect...

Страница 7: ...erter Before the electrical connection use opaque material to cover the PV modules or disconnect PV string DC switch PV arrays will produce dangerous voltage if it is exposure under sun Danger All operation must accomplish by certified electrical engineer Must be trained Completely read the manual operation and understand all information Warming Must get permission by local utility company before ...

Страница 8: ...omagnetic environment without any trouble or error and impose no unacceptable effect upon the environment Therefore EMC represents the quality characters of an electrical equipment The inherent noise immune character immunity to internal electrical noise External noise immunity immunity to electromagnetic noise of external system Noise emission level influence of electromagnetic emission upon envi...

Страница 9: ...ge in the inverter After disconnect with the DC side there is a residual voltage in the inverter operator should wait for 5 minutes to ensure the capacitor is completely discharged Caution of high voltage and electric shock The products operates at high voltages Prior to performing any work on the product disconnect the product from voltage sources All work on the product must be carried out by qu...

Страница 10: ...ion supplied with the product before install Positive pole and negative pole Positive pole and negative pole of the input voltage DC Temperature Indicated the temperature allowance range RCM logo RCM Regulatory Compliance Mark The product complies with the requirements of the applicable Australian standards ...

Страница 11: ...rs the direct current of the PV array to the grid compliant three phase current and feeds into the utility grid Figures 2 1PV Grid Tied System SOFAR 75 136KTL may only be operated with PV arrays photovoltaic module and cabling for on grid condition Do not use this product for any other or additional purposes Any damage or property loss due to any use of the product other than described in this sec...

Страница 12: ...75 136KTL User manual Copyright Shenzhen SOFARSOLAR Co Ltd 8 Supported grid types ...

Страница 13: ...roduct Dimensions The choice of optional parts of inverter should be made by a qualified technician who knows the installation conditions clearly Dimensions Description SOFAR 75 136KTL L W H 995 5 663 5 368mm Figure 2 2 Product front view and left view dimensions ...

Страница 14: ...raneous parts rags boxes equipment etc they must be cleaned regularly and kept visible at all times Figure 2 4 Product label 2 2 Function Description DC power generated by PV arrays is filtered through Input Board then enter Power Board Input Board also offer functions such as insulation impedance detection and input DC voltage current detection DC power is converted to AC power by Power ...

Страница 15: ...is able to produce reactive power thus to feed it into the grid through the setting of the phase shift factor Feed in management can be controlled directly by the grid company through a RS485 interface C Limited the active power fed into grid If enable the limited of active power function inverter can limit the amount of active power fed into the grid to the desired value expressed as percentage D...

Страница 16: ...6KTL has 16 24 DC input strings 8 12 MPPT trackers that converters the direct current of PV array to grid compliant three phase current and feeds in into the utility grid Both DC and AC side has Surge Protection Device SPD Figure 2 4 Schematic diaram For SOFAR 75KTL SOFAR 80KTL SOFAR 100KTL SOFAR 110KTL ...

Страница 17: ...75 136KTL User manual Copyright Shenzhen SOFARSOLAR Co Ltd 13 Figure 2 5 Schematic diaram without N line For SOFAR 100KTL HV SOFAR 125KTL HV SOFAR 136KTL HV 2 4 Efficiency and derating curve ...

Страница 18: ...75 136KTL User manual Copyright Shenzhen SOFARSOLAR Co Ltd 14 2 5 Others Initial short circuit AC current is 756 7A peak ...

Страница 19: ...nd both of these options can be chosen For installations with SAmax SAmax 30kVA the NS protection must be accomplished by a central NS protection device at the central meter panel In the case taking into account the equipment covered by this user manual this situation will happen when several units are connected to the same network connection point Note the NS protection shall meet that a single f...

Страница 20: ...al package and leave desiccant inside sealed tight with taps Keep the storage temperature around 40 70 Relative humidity 0 95 no condensation Figure 3 1 Storage temperature and humidity The maximum stacking layer number cannot exceed 4 layers If the inverter be storage for more than half years the inverter needs to be fully examined and tested by qualified service or technical personnel before usi...

Страница 21: ...the product at a easy to reach location Caution Consider the weight of this product when doing transport and moving Choose an appropriate mounting position and surface At least two persons for installation Attention 4 1 Installation Process 4 2 Checking Before Installation Checking Outer Packing Materials Before unpacking please check the condition of the outer package materials if any damaged fou...

Страница 22: ...ide the package No Pictures Description Quantity 1 SOFAR 75 136KTL 1 pcs 2 Rear Panel 1 pcs 3 PV input connector 75KTL 16 pcs 80KTL 16 pcs 100KTL 20 pcs 110KTL 20 pcs 125KTL 20 pcs 136KTL 24pcs 4 PV input connector 75KTL 16 pcs 80KTL 16 pcs 100KTL 20 pcs 110KTL 20 pcs 125KTL 20 pcs 136KTL 24 pcs 5 PV metal pin 75KTL 16 pcs 80KTL 16 pcs 100KTL 20 pcs 110KTL 20 pcs 125KTL 20 pcs 136KTL 24 pcs 6 PV m...

Страница 23: ...xagon screws 4 pcs 8 M6 30 Hexagon screws 2 pcs 9 Manual 1 pcs 10 Warranty Card 1 pcs 11 Outgoing inspection report 1 pcs 12 Quality Certificate 1 pcs 13 COM 16pin connector 1 pcs 4 3 Tools Prepare tools required for installation and electrical connection as following table ...

Страница 24: ...o drill holes on the wall 2 Screwdriver Use to tighten and loosen screws when installing AC power cable Use to remove AC connectors from the product 3 Removal Tool Remove PV Connector 4 Wire Stripper Used to peel cable 5 With an open end of larger than or greater than 32 mm Used to tighten expansion bolts 6 Rubber Mallet Used to hammer expansion bolts into holes ...

Страница 25: ...que wrench Connect AC connector 9 Crimping Tool Use to crimp cable on grid side load side and CT extensive cable 10 Multimeter Check grounding cable PV positive and negative pole 11 Marker Mark signs 12 Measuring Tape Measure distance 13 Level Ensure the rear panel is properly installed 14 ESD gloves Installer wear when installing product ...

Страница 26: ...duct 4 4 Determining the Installation Position Select a appropriate location to install the product to make sure the inverter can work in a high efficiency condition When selecting a location for the inverter consider the following Note Install vertical or backward tilt within 0 75 Do not install forward or upside down Figure 4 1 Installation Position Selection ...

Страница 27: ... Co Ltd 23 Figure 4 2 Clearance for single inverter Note Other requirement for install position Install position should obstruct the disconnect of power Place inverter in an appropriate bearing capacity objects Location should be avoid touch by children ...

Страница 28: ...75 136KTL User manual Copyright Shenzhen SOFARSOLAR Co Ltd 24 Figure 4 3 Clearance for multiple inverters ...

Страница 29: ...eep the balance when lift the inverter Required at least two operators for lifting or use forklift Inverter is heavy dropped while being transported may cause injuries Do not put the inverter with wiring terminals contacting the floor because the power ports and signal ports are not designed to support the weight of the inverter When place inverter on the floor put it above foam or paper to avoid ...

Страница 30: ...r sides according to the instruction diagram below Note M12 rings need self preparation Figure 4 6 Installation of Rings 2 Fastened and tied the rope through two rings Lifting inverter 50mm above ground by using lifting equipment check the tightening device of the hoisting ring and rope After confirming that the binding connection is secure lift the inverter to the destination ...

Страница 31: ...ch as raining heavy fog winding Attention 4 6 Installation 4 6 1 Installed on wall Step 1 Placed the rear panel on the mounting wall determine the mounting height of the bracket and mark the mounting poles accordingly Drilling holes by using Hammer Drill keep the hammer drill perpendicular to the wall and make sure the position of the holes should be suitable for the expansion bolts ...

Страница 32: ...bolt vertically into the hole Figure 4 9 Screws into the holes Step 3 Align the rear panel with the hole positions fix the rear panels on the wall by tightening the expansion bolt with the nuts Figure 4 10 Install rear panel Step 4 Lift the inverter and hang it on the rear panel and fixing both side of inverter with M6 screw accessories ...

Страница 33: ...anual Copyright Shenzhen SOFARSOLAR Co Ltd 29 Figure 4 11 Fix inverter 4 6 2 Bracket Installation Step 1 Use wall mount bracket ensure the pole position are in same level by using level rule and take a mark with maker ...

Страница 34: ...recommend to do a stain proofing Figure 4 13 Drilling holes Step 3 Use M10 screw and M10 flat washer to secure the wall bracket Note M10 50 screw and M10 flat washer need self preparation Figure 4 14 Fix wall bracket Step 4 Lift the inverter and hang it on the wall bracket and fixing both side of inverter with M6 screw repeat 4 6 1step 4 ...

Страница 35: ...Copyright Shenzhen SOFARSOLAR Co Ltd 31 Note If height between ground and bracket is less than 1 3m use auxiliary handle for installation Otherwise use lifting equipment Figure 4 15 Installation position of auxiliary handle ...

Страница 36: ...e done by certified electrical engineer Attention Before the electrical connection use opaque material to cover the PV modules or disconnect PV string DC switch PV arrays will produce dangerous voltage if it is exposure under sun Danger For this product the open circuit voltage of PV strings should not greater 1100V Note 5 1 Electrical Connection Introduce the electrical connection process 5 2 Ter...

Страница 37: ...re operate inverter check the PV array inverter DC side safety connection and AC side safety connection 5 1 Electrical Connection Figure 5 1flowchart for connecting cables to the inverter 5 2 Terminal Connector Connector description as below Take picture as reference No Name Description A DC input terminals PVX PVX PV connector B USB WIFI port USB WIFI For WIFI GPRS Communication ...

Страница 38: ... NOT grounded Otherwise it will cause inverter failure In the PV system all non current carrying metal parts such as mounting frame combiner box enclosure etc should be connected to earthed Note Preparation prepare the grounding cable recommend 16mm yellow green outdoor cable and M8 OT Terminal Procedure Step 1 Remove the insulation layer with an appropriate length using a wire stripper shown as f...

Страница 39: ... contact the terminal closely Step 3 Remove the screw from the bottom side of inverter Shown as figure 5 4 connect the grounding cable to the grounding point and tighten the grouping screw Torque is 6 7N m A M8 hexagon screw B grounding cable Figure 5 4 Inverter external grounding instruction diagram Note For improving anti corrosion performance after ground cable installed apply silicone or paint...

Страница 40: ...ensure inverter can be cut off with utility grid for abnormal condition The AC cable need to meet the requirement of local grid operator 5 4 1 Open the wiring box Note Forbid to open then main board cover of inverter Before open the wiring box please ensure there is not DC and AC connection If open the wiring box on snowing or raining day please take protective measures to avoid the snow and rain ...

Страница 41: ...erter can only connect to grid after get the permission from local grid company Should not connect any loads between inverter and AC circuit breaker OT DT Requirement When use copper core cable please use copper terminal connector When use copper clad aluminum cable please use copper terminal connector When use aluminum core cable please use Copper and aluminum transition terminal connector or alu...

Страница 42: ...r four core five core copper or aluminum wire Copper Wire 95 185 Aluminum Wire 120 240 PE Wire reference 5 3 Step 1 Open the cover refers to section 5 3 1 Step 2 Turn OFF the AC circuit breaker and secure against reconnection Step 3 Unscrew the nut of the AC terminal block and select the sealing ring according to the outer diameter of the cable Insert the nut sealing ring into the cable in sequenc...

Страница 43: ...yright Shenzhen SOFARSOLAR Co Ltd 39 Step 5 Crimp the Terminal Step 6 Depending on the grid configuration connect L1 L2 L3 and N to the terminals according to the label and tighten the screw on the terminal using a screwdriver ...

Страница 44: ... use M8 terminal connector The position of PE Line and N Line should not be opposite Opposite position may cause inverter permanently faulty As shown in the figure below for HV model the N wire does not need to be connected HV model 100KTL HV 125KTL HV 136KTL HV Step 7 Closed wiring box cover and tighten the screw ...

Страница 45: ... shock Ensure PV array have good insulation condition in any time Ensure same PV string should have the same structure including same model same number of panels same direction same azimuth Ensure PV positive connector connect to inverter positive pole negative conenctor connect to inverter negative pole Please use the connectors in the accessories bag The damage cause by incorrect is not includin...

Страница 46: ...rs Step 3 Insert wire into the connector cap nut and assemble into the back of male or female plug When you heard a click the pin tact assembly is seated correctly 3 Positive Connector 4 negative connector Step 4 Measure PV voltage of DC input with multimeter verify DC input cable polar and connect DC connector with inverter until hearing a slight sound indicated connection succeed ...

Страница 47: ... make sure the PV array positive pole and negative pole Dealing If need to remove the PV connector from inverter side please use the Removal Tool as below diagram move the connector gently Before moving the positive and negative connector please make sure DC Switch is on OFF position Note Figure 5 10 Removal DC connector ...

Страница 48: ...B WIFI Port Port Description USB WIFI port USB USB PORT Use for updating the software WIFI WIFI PORT Use for connect Wi Fi GPRS Ethernet for data transmission Procedure WIFI GPRS Ethernet By the USB acquisition stick WIFI GPRS Ethernet transfer the inverter power output information alarm information operation state to the PC terminal or local data acquisition device then uploaded to the server Reg...

Страница 49: ...485 Communication Wire Outdoor shielded twisted pair meets local standards 3core 4 8 0 25 1 Port Description PIN Define Function Note 1 RS485A RS485 signal Wire connection monitoring or multiple inverter monitoring 2 RS485A RS485 signal 3 RS485B RS485 signal 4 RS485B RS485 signal 5 Electric meter RS485A Electric meter RS485 signal Wire connection Electric meter 6 Electric meter RS485B Electric met...

Страница 50: ...rface for AS NZS 4777 2 2020 also known as inverter demand response modes DRMs The inverter will detect and initiate a response to all supported demand response commands within 2 s The inverter will continue to respond while the mode remains asserted Table 4 3 Function description of the DRMs terminal Pin NO Function 9 DRM1 5 10 DRM2 6 11 DRM3 7 12 DRM4 8 13 GND ...

Страница 51: ...installation Figure 4 14 Inverter RRCR Connection K4 K3 K2 K1 G L4 L3 L2 L1 RRCR Table 4 4 Function description of the terminal Pin NO Pin name Description Connected to RRCR 9 L1 Relay contact 1 input K1 Relay 1 output 10 L2 Relay contact 2 input K2 Relay 2 output 11 L3 Relay contact 3 input K3 Relay 3 output 12 L4 Relay contact 4 input K4 Relay 4 output 13 G GND Relays common node Table 4 5 The i...

Страница 52: ...ription of the terminal Pin NO Pin name Description Connected to RRCR 9 L1 Relay contact 1 input K1 Relay 1 output 13 G GND K1 Relay 1 output Table 4 7 The inverter is preconfigured to the following RRCR power levels Relay status close is 1 open is 0 L1 Active Power Power drop rate Cos φ 1 0 5 seconds 1 0 100 1 RS485 By RS485 interface transfer the inverter power output information alarm informati...

Страница 53: ...AR 75 136KTL is used use a communication cable refer to section 5 6 2 for COM pin definition and choose either of the two RS485 ports Figure 5 12 A single SOFAR 75 136KTL connecting communications The length of the RS485 communication cable should be less than 1000 m The length of the WIFI communication cable should be less than 100 m Note ...

Страница 54: ...nverter Step 1 Turn ON the DC switch Step 2 Turn ON the AC circuit breaker When the DC power generated by the solar array is enough the SOFAR 75 136KTLinverter will start automatically Screen showing normal indicates correct operation NOTE 1 Choose the correct country code refer to section 7 3 of this manual NOTE 2 Different distribution network operators in different countries have different requ...

Страница 55: ... 136KTL User manual Copyright Shenzhen SOFARSOLAR Co Ltd 51 out of incorrect country code selection If the inverter indicates any fault please refer to Section 8 1 of this manual trouble shooting for help ...

Страница 56: ...erter 7 1 Operation and Display Panel Buttons and Indicator lights Button Short press UP button go up Long press UP button exit current interface v Short press DOWN button go down v Long press DOWN button enter current interface Indicator Lights GFI Red light ON GFCI faulty Normal Green light flashing counting down or checking Normal Green light ON Normal Alarm Red light ON recoverable or unrecove...

Страница 57: ...nection PV input current and voltage grid voltage current and frequency today generation total generation Inverter working status PV 1 12 PV input voltage and current Inverter working status PV generated power Inverter working status today generated electricity Inverter working status total generated electricity Inverter working status grid voltage and current ...

Страница 58: ... frequency Inverter working status Wi Fi RS485 status Inverter faulty alarm When power turn on LCD interface displays INITIALIZING refer below picture When control board successfully connected with communication board the LCD display the current state of the inverter display as shown in the figure below ...

Страница 59: ...are are well functional Inverter will go to Fault State or Permanent State if any error or fault occurs Normal Inverter enter to Normal State it is feeding power to the grid inverter will go to Fault State or Permanent state if any error or fault occurs Fault Fault State Inverter has encountered recoverable error It should recover if the errors disappear If Fault State continues please check the i...

Страница 60: ...c Interface 5 On Off Control 12 IV Curve Scan 6 Set Energy 13 PID 7 Set Address Long press the button to Enter the main interface of 1 Enter Setting and long press to enter the setting menu You can select the content you want to set by short pressing the button Note1 Some settings need to enter the password the default password is 0001 when entering the password short press to change the number lo...

Страница 61: ...PTs can work interdependently or divided into parallel mode User can change the setting according to the configuration 9 Set Language Set the inverter display language 10 Set RefluxP Long press the down button to enter the RefluxP enable selection interface enter the default password 0001 and then Long press the down button to enter the reverse current power setting interface and you can enter the...

Страница 62: ...ress the button and short press the button to turn the page in standard interface then enter into 2 Event List interface 2 Event List 1 Current event 2 History event Fault information 001 ID04 06150825 Display the event sequence number event ID number and event occurrence time A SystemInfo Interface as below 3 SystemInfo Long press DOWN button 1 Inverter Type 7 Input Mode 2 Serial Number 8 Remote ...

Страница 63: ...C switch remove the communication board cover as below figure If the RS485 line has been connected please release the waterproof nut first and make sure the communication line is no longer the force Then remove the waterproof cover Figure 7 1Remove communication broad cover Step 2 Insert USB into computer Step 3 SOFARSOLAR service team will send the software code to user After user receive the fil...

Страница 64: ...DSP update success the LCD will display Update DSP2 Success otherwise display UpdateDSP2 Fail Step 8 If Fail please turn off the DC switch wait for the LCD screen turn off then turn on the DC switch again then Continue to update from step 5 Step 9 After the update is completed turn off the DC breaker wait for the LCD screen extinguish then recover the communication waterproof and then turn on the ...

Страница 65: ...ovide users with troubleshooting methods and tips The process to check the event list can refers to Manual Chapter 7 3 B Figure 8 1 Even list Code Name Description Solution ID001 GridOVP The grid voltage is too high If the alarm occurs occasionally the possible cause is that the electric grid is abnormal occasionally Inverter will automatically return to normal operating status when the electric g...

Страница 66: ...btaining approval from the local electrical grid operator ID007 LVRT LVRT function is faulty ID008 IslandFault Island protection error ID009 GridOVPInst ant1 Transient overvoltage of grid voltage 1 ID010 GridOVPInst ant2 Transient overvoltage of grid voltage 2 ID011 VGridLineFa ult Power grid line voltage error ID012 InvVoltFault Inverter voltage error Internal faults of inverter switch OFF invert...

Страница 67: ... the input mode parallel independent mode Settings for the inverter If not change the input mode ID050 TempErrHeat Sink1 Radiator 1 temperature protection For Inner BMS battery make sure that the battery NTC cable is properly connected Make sure the inverter is installed where there is no direct sunlight Please ensure that the inverter is installed in a cool well ventilated place Ensure the invert...

Страница 68: ... voltage Voc is higher than the maximum input voltage of the inverter If so adjust the number of PV modules in series and reduce the PV series voltage to fit the input voltage range of the inverter After correction the inverter will automatically return to its normal state ID071 LLCBusOVP LLC BUS overvoltage protection Internal faults of inverter switch OFF inverter wait for 5 minutes then switch ...

Страница 69: ...ter is installed in a cool well ventilated place Ensure the inverter is installed vertically and the ambient temperature is below the inverter temperature limit ID114 FreqDerating AC frequency is too high Please make sure the grid frequency and voltage is within the acceptable range ID115 FreqLoading AC frequency is too low ID116 VoltDerating AC voltage is too high ID117 VoltLoading AC voltage is ...

Страница 70: ...otection ID145 USBFault USB fault Check the USB port of the inverter ID146 WifiFault Wifi fault Check the Wifi port of the inverter ID147 BluetoothFau lt Bluetooth fault Check the bluetooth connection of the inverter ID148 RTCFault RTC clock failure Internal faults of inverter switch OFF inverter wait for 5 minutes then switch ON inverter Check whether the problem is solved If no please contact te...

Страница 71: ...verter is running normally ID173 FanFault5 Fan 5 fault Please check whether the fan 5 of inverter is running normally ID174 FanFault6 Fan 6 fault Please check whether the fan 6 of inverter is running normally ID175 FanFault7 Fan 7 fault Please check whether the fan 7 of inverter is running normally ID176 MeterComm Lose Meters communication fault Check whether the meters wiring is correct ID189 AFC...

Страница 72: ... with water corrosive chemicals detergent etc 8 3 Anti PID When the inverter is running the PID function module increases the potential between the negative pole of the photovoltaic array and the ground to a positive value to suppress the PID effect Note 1 Before enabling the PID recovery function ensure that the polarity of the pv module s ground voltage meets requirements If in doubt please cont...

Страница 73: ...odule will apply reverse voltage to the photovoltaic module to restore the degraded module 5 If the PID recovery function is enabled the PID works only at night 6 After the PID recovery function is enabled the PV series voltage to ground is 500Vdc by default You can change the default value through the App ...

Страница 74: ...SOFAR 80KTL SOFAR 100KTL SOFAR 110KTL SOFAR 100KTL HV SOFAR 125KTL HV SOFAR 136KTL HV Max input current 26A 8 26A 10 26A 12 Max DC input short circuit current per MPPT 40A 8 40A 10 40A 12 Max input voltage 1100V Start voltage 200V Rated input voltage 625V 725V 785V MPPT operating voltage range 180V 1000V Full power MPPT voltage range 500V 850V 550V 850V MPPT strings per MPPT 8 2 8 2 10 2 10 2 10 2...

Страница 75: ...121KVA 110KVA 137KVA 150KVA Rated output current 108A 116A 145A 159A 115A 144A 145A Max output current 113A 128A 160A 175A 128A 160A 160A Short circuit Current Peak 756 7A Short circuit Current RMS 378A Nominal grid voltage 3 N PE 230V 400Vac 220V 380Vac 3 PE 500Vac 3 PE 54 0Vac Grid voltage range 310Vac 480Vac 400Vac 575Vac 432 621 Vac Nominal frequency 50Hz 60Hz Grid frequency range 45Hz 55Hz 54...

Страница 76: ...00 99 00 European Weighted efficiency 98 20 98 20 98 30 98 30 98 50 98 50 98 51 MPPT efficiency 99 9 Safety Protection Anti Islanding DC switch RCMU Ground fault monitoring level II SPD Certification AS NZS 4777 VDE V 0124 100 V0126 1 1 VDE AR N 4105 CEI 0 21 CEI 0 16 EN50438 EN50549 G83 G59 G98 G99 UTE C15 712 1 UNE206 007 1 Protection level LevelⅠ External environment pollution degree Degree3 Ov...

Страница 77: ...HV SOFAR 125KTL HV SOFAR 136KTL HV Topology Transformless Operation Temperature 30 60 Relative humidity 0 100 DC Switch Yes Cooling Smart forced air cooling Altitude 2000m Dimension 995 5 663 5 368mm Display LCD Bluetooth APP Mounting Wall mount Communicat ion WiFi GPRS RS485 PLC optional Weight 88KG 88KG 90KG 90KG 90KG 90KG 92KG Protection degree IP66 ...

Страница 78: ...erter SN number of machine based on the first date of arrival Customers can apply to buy extended warranty products from the company s sales team by providing the product serial number Our company may refuse to do not conform to the time limit extended warranty purchase application Customers can buy an extended warranty of 5 10 15 years If the customer wants to apply for the extended warranty serv...

Страница 79: ...een 5 Incorrect installation debugging and use methods 6 Failure to comply with safety regulations certification standards etc 7 Damage caused by improper storage by dealers or end users 8 Transportation damage including scratches caused by internal packaging during transportation Please claim directly from the transportation company or insurance company as soon as possible and obtain damage ident...

Страница 80: ...ADD 11 F Gaoxinqi Technology Building No 67 Area Xingdong Community Xin an Sub district Bao an District Shenzhen City China Email service sofarsolar com Tel 0510 6690 2300 Web www sofarsolar com ...

Отзывы: