MASTERYS IP+
40-60 kVA 3/1
IT
ALIANO
ENGLISH
8
IOMMASIPXX07-GB 02
UNPACKING AND INSTALLATION
OF THE UNIT
3
The packaging guarantees the stability of the UPS during shipping and physical transfer. Carry the packaged unit as
close as possible to the installation site.
When moving the unit on even slightly sloping surfaces, use the blocking equipment and break-
ing devices to ensure that the unit does not fall over.
3.1 SHIPPING AND MOVING.
• The UPS must remain in a vertical position during all shipping and moving operations.
• Ensure that the fl oor is strong enough to support the weight of the UPS and of the battery cabinet, if used.
Avoid pressing on the front door when moving the unit.
The UPS MUST only be moved by two people at least bt the mean of a forklift.
All packaging material must be recycled in compliance with the laws in force in the country where
the system is installed.
Содержание MASTERYS IP+
Страница 1: ...INSTALLATION AND OPERATING MANUAL MASTERYS IP 40 60 kVA 3 1...
Страница 2: ......
Страница 52: ......
Страница 53: ...PARALLEL 1 1 REDUNDANT CONFIGURATION MASTERYS IP 40 60 kVA 3 1...
Страница 57: ......
Страница 58: ......
Страница 59: ......