42
EN
Operating modes 'MODULYS GP' 100 kW UL - Ref.: IOMMODGPXX09-EN 03
SWITCHING ON FROM MAINTENANCE BYPASS
• Put the external manual bypass switch to position
0
.
WARNING! This operation interrupts the power supply to the load.
• Put switch
Q1
(or the external input mains switching device) into position
1
.
• Wait for the display to switch on.
• Enter menu
MAIN MENU > CONTROLS > UPS PROCEDURE
.
• Select
Automatic Start Procedure
and press
ENTER
.
• Carry out the operations indicated on the display.
8.4 EXTENDED OUT OF SERVICE
When the UPS is deactivated for some time, the batteries must be recharged regularly.
They have to be recharged every three months.
• Connect the mains to the UPS.
• Put switch
Q1
into position
1
.
• Wait for the display to switch on.
• Close the external battery breaker/fuses.
• Put or keep switch
Q3
in position
0
.
• The battery must be charged for at least ten hours.
• Once ten hours have elapsed, open the external battery breaker/fuses.
• Put switch
Q1
into position
0
.
8.5 EMERGENCY SHUTDOWN
NOTE!
This operations interrupts the supply to the output load from both inverters and automatic
bypass.
UPS POWER OFF
System with input and output switches: put
Q3
to position
0
when it’s necessary to interrupt the power supply
quickly. Refer to figure
1
.
1
REMOTE UPS POWER OFF
It is possible to interrupt the power supply to the output load using the ADC+SL board. Refer to 'Standard features
and options' chapter.
Содержание Green Power 2.0
Страница 1: ...INSTALLATION AND OPERATING MANUAL MODULYS GP Green Power 2 0 range 100 kW UL EN www socomec com...
Страница 2: ......
Страница 20: ...20 EN Operating modes MODULYS GP 100 kW UL Ref IOMMODGPXX09 EN 03 POWER MODULE REMOVAL A B C 1 2 3 4 5 6 7...
Страница 50: ...50 EN Operating modes MODULYS GP 100 kW UL Ref IOMMODGPXX09 EN 03 10 4 TOP AIR EXHAUSTED 10 5 TOP ENTRY CABLES...
Страница 54: ......
Страница 55: ......