8
4.
Adjust the ¼” NC x 2” lg. Hex bolt so that the end of the bolt is in contact with the
carriage. Tighten the ¼” NC hex nut on the bolt.
5.5
TOWER POSITIONING AND SETUP
1.
Locate the power side and slave side tower to the relative position as shown in
Figure 3.
Double check all dimensions.
2.
Using a step ladder, install the crossmember. Raise and place the crossmember
mounting hooks over the top of the tower. Install and
tighten
the crossmember using
eight (8) 1/2”-13UNC x 1¼”LG. hex head bolts, flat washers, lockwashers and hex
nuts.
3.
Check the towers to make sure they are located, and positioned in the correct
location.
5.6
ARM INSTALLATION
1.
Remove the four (4) 5/16”-18UNC x 3/4”LG. hex head bolts that are holding the
arm pins to the arm. Install the arms on the carriages.
2.
Grease and insert arm pins. Align the notch on each arm pin with the tapped hole
on the arm, and using the 5/16”-18UNC x 3/4”LG. hex head bolt removed in
previous step, reinstall and tighten securely.
3.
Using two (2) 5/16”-18UNC x 1 ¼” LG. hex head bolts and two (2) 5/16”
flatwashers, attach each arm restraint gear as shown in
Figure 5
.
FRONT
REAR
Figure 5 – Arm Installation
Содержание EELR 343A
Страница 22: ...21 7 SAFETY AWARENESS AUTOMOTIVE LIFT INSTITUTE ALI ...
Страница 23: ...22 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Страница 26: ...25 8 3 HYDRAULIC SYSTEM ...
Страница 28: ...27 8 5 POWER PACK 6 1935 AB 1399 208 230V 1PH 60Hz ...