17
Figure 13 – Crossmember Leveling
Figure 14 – Tower Leveling
Figure 15 – Shim Placement
Figure 16 – Anchor Installation
3.
Refer to Bay Layout
(Figure 3)
to ensure that the column is still in the proper
position. Using a rotary hammer drill with a ¾” masonry drill bit, drill holes in
the floor on the high side column using the tower baseplate as a template. Make
sure that the ¾” masonry drill is in good condition
(Figure 16A)
.
4.
Carefully clean out drilling dust from the anchor holes. Hammer in the anchor
bolts
(Figure 16B)
. Hand tighten all anchor bolts.
Содержание EELR 343A
Страница 22: ...21 7 SAFETY AWARENESS AUTOMOTIVE LIFT INSTITUTE ALI ...
Страница 23: ...22 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Страница 26: ...25 8 3 HYDRAULIC SYSTEM ...
Страница 28: ...27 8 5 POWER PACK 6 1935 AB 1399 208 230V 1PH 60Hz ...