It is the user’s responsibility to provide all wiring for electrical hook-up prior to
installation and to insure that the electrical installation conforms to local building
codes. Where required, it is the user’s responsibility to provide an electrical
isolation switch located in close proximity to the lift that will enable emergency stop
capability and isolate electrical power from the lift for any servicing requirements.
Tools Required:
1.
16ft. Measuring Tape
2.
Chalk Line
3.
Rotary Hammer Drill
4.
diameter Masonry Drill Bit
5.
Hammer
6.
SAE Wrenches and Ratchet Set
7.
2ft. Level
8.
4ft. Level
9.
Crow Bar
10.
One 12ft. Step Ladder
11.
Side Cutters
12.
Screwdrivers
13.
15ft. Bleeder Hose (Clear) w/ 3/8”JIC Swivel F fitting on one end
14.
4"x4" Wooden Blocks (for unpackaging)
5
INSTALLATION INSTRUCTIONS
When the lift arrives on site, please read the owner’s manual and check for any freight
damages. Also, check the contents to make sure no parts are missing before starting
installation. Gather all the tools listed and make sure the installation instructions are
fully understood before commencing installation.
5.1
UNPACKING PROCEDURE
1.
Important!
Place the main structural components on wooden blocks so that the steel
frames can be removed.
2.
Remove plastic wrapping.
3.
Remove crossmember, and hydraulic line.
4.
Remove steel frames.
5.
Lay towers on floor with the carriage side up.
6.
Check the installation area for obstructions. (Lights, Heating Ducts, Ceiling, Floor
Drains...etc.)
Содержание EELR 343A
Страница 22: ...21 7 SAFETY AWARENESS AUTOMOTIVE LIFT INSTITUTE ALI ...
Страница 23: ...22 8 PARTS MANUAL 8 1 LIFT ASSEMBLY ...
Страница 26: ...25 8 3 HYDRAULIC SYSTEM ...
Страница 28: ...27 8 5 POWER PACK 6 1935 AB 1399 208 230V 1PH 60Hz ...