![Snap-on Incorporated EEWB314A Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/snap-on-incorporated/eewb314a/eewb314a_service-manual_1307449036.webp)
Page 3-18
CHAPTER 3 CHECKOUT, CALIBRATION AND MAINTENANCE
Effective
09/2005
Screw
10 Pin
connector
Spacers /
Bolts
Figure 3-35
FIGURE 3-36
VIBRATORY MEMBER REMOVAL
• Disconnect the power from the rear of the
machine.
• Remove the Display panel.
• Remove the weight tray.
• Remove the rear transducer.
• Using 1/4” drive 6mm hex head SOT part #
TMAM6E remove the six (6mm) hex bolts to the
vibratory. Pay special attention of spacer
placement. (Figure 3-35)
• Lift up on the vibratory member and remove.
VIBRATORY INSTALLATION
• Lift and set vibratory member into the balancer
housing.
• Insert spacers.
• Apply Loctite® to the hex bolts.
• With the aid of a helper start the two lower hex
bolts.
• Install the 4 remaining hex bolts and tighten to
22ft. lbs. +/- 3 in. lbs.
• Install the rear transducer and follow transducer
installation.
• Install weight tray.
• Install control panel assmebly.
• Connect power and follow all calibration proce-
dures
P83, P84
and test.
NOTE: THE SERVICE TECHNICIAN MUST USE
THE PRUEFROTOR AFTER THE
INSTALLATION OF A VIBRATORY
MEMBER IN ORDER TO ENSURE ISO
9000 STANDARDS.
ENCODER REMOVAL
(Figure 3-36)
• Disconnect power.
• Remove Main PCB.
• Remove weight tray.
• Disconnect the 10 Pin ribbon cable from the
encoder PCB.
• Remove the phillip screw holding the encoder
pcb to the shaft tube.
NOTE: BE CAREFUL NOT TO LET FOREIGN
DEBRIS FALL INSIDE THE TUBE.