14
Assembly
Step 14: Installing the Charcoal Basket
Lifting System
Locate
: Charcoal Basket Lift Handle, Charcoal
Basket Lifting System, (4) M6x15 bolts, (2)
Hinge Pins and (2) “R” Clips
Procedure
:
Slide the charcoal basket lift handle through the
adjusting slot and through the hole of the inside
plate as shown in Figure 14A. Align the hole in
the end of the lift handle with the holes in the “U”
shaped bracket located at the back of the
cabinet. Join the lift handle and the “U” shaped
bracket by inserting a hinge pin as shown in
Figure 14B. Then insert an “R” clip though
the hole in the hinge pin.
Place the charcoal basket lifting system into the
cabinet and attach it to the back wall by inserting
(4) M6x15 bolts through the back side of the
cabinet wall as shown in Figure 14C.
Attach the charcoal basket lift handle to the
charcoal basket lifting system by inserting a
hinge pin through the “U” shaped lifting arm and
the hole in the center of the lifting handle as
shown in Figure 14D. Then insert an “R” clip
through the hole in the hinge pin.
You should now be able to adjust the charcoal
basket lifting system to your desired height by
moving the lifting handle to the left and raising or
lowering it.
Step 14
Fig.14 B
Hole
Fig.14A
Inside Cabinet
Fig.14C
Fig.14D