24
Operation
CONSOLE FIELD TEST
1. Drive down field or road at target speed with sprayer booms off, to verify SPEED readout on Console.
2. Turn on sprayer and booms and place the RATE 1/RATE 2/MAN switch to RATE 1. Increase or decrease
speed by one MPH (2 kph). The system should automatically correct to the target application rate.
3. If for any reason, the system is unable to correct to the desired RATE, check for an empty tank, a plugged
line, a malfunctioning pump, improper vehicle speed or a defect in the system.
4. If the system does not appear to be correcting properly, first review Initial Console Setup, then refer to
Troubleshooting in the Parts/Service Manual.
5. At the end of each row, shut off flow with the Master On/Off switch. This also shuts off area totalizer.
6. Verify area covered and volume used.
SPRAY OPERATION
(AFTER PROPER SETUP AND CALIBRATION)
1. Add
1
/
2
the amount of water required for the spray operation to tank using air gap filler.
2. Start engine, set engine speed below 2000 RPM, and engage pump after taking all previously described
safety and operation precautions.
3. Open agitator valve.
4. Add chemicals (taking all precautions described in this manual and by the chemical manufacturer).
a. Liquids may be poured directly into tank.
b. Wettable powder chemicals must be pre-mixed with water in a container to form a slurry. The mixture
is then added to the tank through the fillwell strainer.
c. Chemical in soluble packs are place into the fillwell strainer basket and dissolved by adding water
through the basket.
The balance of the water required for the spray operation is added to the tank through the fillwell strainer,
using the air gap filler. This will wash any undissolved chemical into the tank.
5. Transport to sprayer site with and agitator operating.
6. Set Engine speed between 2000-3200 RPM.
7. (Optional) Engage ground speed control.
8. Obtain desired spraying speed before activating spray with switches on spray control console.
Review the capacity of nozzles being used. Total capacity of all nozzles plus agitation system
must not exceed pumping system capabilities refer to Spraying Procedure section of this
manual. FLUSH PUMP AFTER USE
Shut-Off 20GPM 40GPM 60GPM 80GPM 100GPM
120psi
100psi
80psi
60psi
30psi
10psi
100psi
95psi
76psi
52psi
26psi
5psi
80psi
75psi
62psi
45psi
21psi
-
60psi
55psi
40psi
25psi
5psi
-
To determine the correct performance data for your application, first shut off all flow on discharge side of pump and
detemine the shut-off pressure at the pump. Use this Shut-Off pressure to determine which line of data applies.